Analysis of Trass Stone Inventory Control With EOQ and JIT Methods

PT ABC is a company engaged in the cement manufacturing industry. In making cement at PT ABC, one of the raw materials used is Trass Stone. PT ABC in carrying out its production process from raw materials to finished goods experiences problems in the supply of raw materials which are sometimes excess or deficient. From these problems it is necessary to analyze the control of trass stone inventory using the Economic Order Quantity (EOQ) and Just In Time (JIT) approaches to control the optimal and efficient trass stone inventory, because it can calculate the amount of inventory, safety stock, and total inventory costs. The results showed that using the Economic Order Quantity (EOQ) and Just In Time (JIT) methods is more optimal and efficient than company policy. It can be seen from the total inventory cost of trass stone using company policy of Rp. 22,442,213, the total cost of trass stone inventory using the EOQ method is Rp. 10,269,996, while the total cost of trass stone inventory using the JIT method is Rp. 7 ,480,737.

Authors

Institutions

Publication Details

Journal
INTECOMS Journal of Information Technology and Computer Science
Published
2024-12-31
DOI
https://doi.org/10.31539/intecoms.v7i6.13852
Primary Topic
Image Processing and 3D Reconstruction
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of Trass Stone Inventory Control With EOQ and JIT Methods

Dzakiyah Widyaningrum, Mochamad Ramadhan Indra Saputra
1 links
INTECOMS Journal of Information Technology and Computer Science
Image Processing and 3D Reconstruction
article

Analysis of Trass Stone Inventory Control With EOQ and JIT Methods

Dzakiyah Widyaningrum, Mochamad Ramadhan Indra Saputra
article en

Abstract

PT ABC is a company engaged in the cement manufacturing industry. In making cement at PT ABC, one of the raw materials used is Trass Stone. PT ABC in carrying out its production process from raw materials to finished goods experiences problems in the supply of raw materials which are sometimes excess or deficient. From these problems it is necessary to analyze the control of trass stone inventory using the Economic Order Quantity (EOQ) and Just In Time (JIT) approaches to control the optimal and efficient trass stone inventory, because it can calculate the amount of inventory, safety stock, and total inventory costs. The results showed that using the Economic Order Quantity (EOQ) and Just In Time (JIT) methods is more optimal and efficient than company policy. It can be seen from the total inventory cost of trass stone using company policy of Rp. 22,442,213, the total cost of trass stone inventory using the EOQ method is Rp. 10,269,996, while the total cost of trass stone inventory using the JIT method is Rp. 7 ,480,737.

INTECOMS Journal of Information Technology and Computer ScienceVol. 7(6)
Universitas Muhammadiyah Gresik (ID)
Openalex Percentile: Top 71%
Image Processing and 3D Reconstruction
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.