Transient Processes in Formation of Geotechnical Systems in Deep Open Pit Mines: Methodical Aspects

The authors describe the methodological approach to formation of geotechnical systems of deep open pit mines with regard to transient processes. Parameters and figures of subsystems of a geotechnical system, and their elements have a great number of interconnections and undergo changes within the space of life of an open pit. Their formation is considered as a set of stable functioning periods and transient processes. The terminological paradigm of structure, components and parameters of the geotechnical system of an open pit mine is described in the context of the open pit mine transport. The concept of adaptation of the technology and equipment subsystems during transient processes is presented as a mechanism of optimal functioning of the geotechnical system. The provision of their dynamic equilibrium is illustrated. Optimization of transportation as the most expensive process in open pit mining is based on integration of computer modeling techniques: geometrical, process simulation and economic mathematical. The key features of pitwall stability estimates in substantiation of the geotechnical system parameters are discussed. The approach to optimization of rock mass preparation by blasting on the basis of real-time adjustment of physical and mechanical parameters of rocks and rock mass data is described.

Authors

Institutions

Publication Details

Journal
Journal of Mining Science
Published
2024-12-01
DOI
https://doi.org/10.1134/s1062739124060103
Primary Topic
Geotechnical and Geomechanical Engineering
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Transient Processes in Formation of Geotechnical Systems in Deep Open Pit Mines: Methodical Aspects

E. S. Shimkiv, А.Г. Журавлев, A. V. Glebov, S. N. Zharikov et al.
Journal of Mining Science
Geotechnical and Geomechanical Engineering
article

Transient Processes in Formation of Geotechnical Systems in Deep Open Pit Mines: Methodical Aspects

E. S. Shimkiv, А.Г. Журавлев, A. V. Glebov, S. N. Zharikov, V. L. Yakovlev
article en

Abstract

The authors describe the methodological approach to formation of geotechnical systems of deep open pit mines with regard to transient processes. Parameters and figures of subsystems of a geotechnical system, and their elements have a great number of interconnections and undergo changes within the space of life of an open pit. Their formation is considered as a set of stable functioning periods and transient processes. The terminological paradigm of structure, components and parameters of the geotechnical system of an open pit mine is described in the context of the open pit mine transport. The concept of adaptation of the technology and equipment subsystems during transient processes is presented as a mechanism of optimal functioning of the geotechnical system. The provision of their dynamic equilibrium is illustrated. Optimization of transportation as the most expensive process in open pit mining is based on integration of computer modeling techniques: geometrical, process simulation and economic mathematical. The key features of pitwall stability estimates in substantiation of the geotechnical system parameters are discussed. The approach to optimization of rock mass preparation by blasting on the basis of real-time adjustment of physical and mechanical parameters of rocks and rock mass data is described.

Journal of Mining ScienceVol. 60(6)
Institute of Mining (RU), Mining Institute of the Ural Branch of the Russian Academy of Sciences (RU)
Openalex Percentile: Top 69%
Geotechnical and Geomechanical Engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Transient Processes in Formation of Geotechnical Systems in Deep Open Pit Mines: Methodical Aspects — E. S. Shimkiv, А.Г. Журавлев, et al. · Journal of Mining Science (2024) | TGRS Research Map | TGRS