Agile Transformation on Capital Substation Projects

The Agile transformation of 132/11 kV Capital Substation Projects has significantly improved efficiency, cost-effectiveness, and sustainability in infrastructure development. By leveraging Lean and Agile methodologies, including Scrum frameworks, process streamlining, and extensive workforce training, project delivery timelines were reduced by 30%, cutting construction duration from 30 to 21 months. This transformation resulted in AED 1.8M in cost savings per substation, amounting to AED 27M annually, alongside an 84% improvement in first-time drawing approvals. Additionally, the integration of precast construction methods reduced 3,165 tons of CO₂ emissions across 15 substations, reinforcing Agile’s role in sustainable project management. The benchmarking of these innovations against other government authority CFR process further highlights Agile’s scalability and industry relevance. These findings demonstrate that Agile is not only a project management methodology but a transformative approach that enhances speed, cost-efficiency, governance, and sustainability in capital infrastructure projects.

Authors

Publication Details

Journal
Saudi Journal of Engineering and Technology
Published
2025-03-15
DOI
https://doi.org/10.36348/sjet.2025.v10i03.003
Citations
2
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
2.01
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Agile Transformation on Capital Substation Projects

Denis J. Murphy, L. Sultan, Khalifa Al Mhairi, Abdulrasheed Pareed et al.
2 citations
Saudi Journal of Engineering and Technology
BIM and Construction Integration
2.01
article

Agile Transformation on Capital Substation Projects

Denis J. Murphy, L. Sultan, Khalifa Al Mhairi, Abdulrasheed Pareed, Lamya Al Mulla, Noora Almazrooei, Majedah Ahmed Alawadhi, Obaid Abdulla Alkhzaimi, Haifa Ismail Mohammad Sharif, Maher Alejel
article en
2 citations

Abstract

The Agile transformation of 132/11 kV Capital Substation Projects has significantly improved efficiency, cost-effectiveness, and sustainability in infrastructure development. By leveraging Lean and Agile methodologies, including Scrum frameworks, process streamlining, and extensive workforce training, project delivery timelines were reduced by 30%, cutting construction duration from 30 to 21 months. This transformation resulted in AED 1.8M in cost savings per substation, amounting to AED 27M annually, alongside an 84% improvement in first-time drawing approvals. Additionally, the integration of precast construction methods reduced 3,165 tons of CO₂ emissions across 15 substations, reinforcing Agile’s role in sustainable project management. The benchmarking of these innovations against other government authority CFR process further highlights Agile’s scalability and industry relevance. These findings demonstrate that Agile is not only a project management methodology but a transformative approach that enhances speed, cost-efficiency, governance, and sustainability in capital infrastructure projects.

Saudi Journal of Engineering and TechnologyVol. 10(03)
Openalex Percentile: Top 16%
BIM and Construction Integration
2.01
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Agile Transformation on Capital Substation Projects — Denis J. Murphy, L. Sultan, et al. · Saudi Journal of Engineering and Technology (2025) | TGRS Research Map | TGRS