Resolving Pigging Stalls in Low-Pressure Offshore Gas Pipelines: A Case Study on Pressure Optimization at Offshore Southeast Sumatra, Indonesia

A pigging stall occurred in a 5.9 km, 16-inch offshore gas pipeline, connecting an offshore platform to a Floating Storage Offloading Unit (FSO), due to insufficient platform pressure (~60 psig). The stalled pigging operation halted production and created significant operational inefficiencies. The aim of this study was to determine the minimum pressure required to prevent further pig stalls. A detailed flow assurance analysis, using multiphase transient modeling, identified that the optimal launching pressure to ensure pigging continuity was between 78-80 psig. Following these recommendations, field trials were conducted, successfully eliminating the stall and restoring pipeline functionality. These findings underscore the critical role of pressure optimization in pigging operations and highlight the effectiveness of flow assurance methodologies in mitigating operational risks and ensuring uninterrupted production.

Authors

Institutions

Publication Details

Journal
E3S Web of Conferences
Published
2025-01-01
DOI
https://doi.org/10.1051/e3sconf/202562103009
Primary Topic
Offshore Engineering and Technologies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Resolving Pigging Stalls in Low-Pressure Offshore Gas Pipelines: A Case Study on Pressure Optimization at Offshore Southeast Sumatra, Indonesia

Enriko Fadly, Muhammad Ridho, Riko Meidiya Putra, Muhammad Nauval Rizki et al.
E3S Web of Conferences
Offshore Engineering and Technologies
article

Resolving Pigging Stalls in Low-Pressure Offshore Gas Pipelines: A Case Study on Pressure Optimization at Offshore Southeast Sumatra, Indonesia

Enriko Fadly, Muhammad Ridho, Riko Meidiya Putra, Muhammad Nauval Rizki, Daviq Chandra Kosasi, Erik Anang Safii, Muhamad Mujiburochman
article en

Abstract

A pigging stall occurred in a 5.9 km, 16-inch offshore gas pipeline, connecting an offshore platform to a Floating Storage Offloading Unit (FSO), due to insufficient platform pressure (~60 psig). The stalled pigging operation halted production and created significant operational inefficiencies. The aim of this study was to determine the minimum pressure required to prevent further pig stalls. A detailed flow assurance analysis, using multiphase transient modeling, identified that the optimal launching pressure to ensure pigging continuity was between 78-80 psig. Following these recommendations, field trials were conducted, successfully eliminating the stall and restoring pipeline functionality. These findings underscore the critical role of pressure optimization in pigging operations and highlight the effectiveness of flow assurance methodologies in mitigating operational risks and ensuring uninterrupted production.

E3S Web of ConferencesVol. 621
Pertamina (Indonesia) (ID)
Openalex Percentile: Top 93%
Offshore Engineering and Technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Resolving Pigging Stalls in Low-Pressure Offshore Gas Pipelines: A Case Study on Pressure Optimization at Offshore Southeast Sumatra, Indonesia — Enriko Fadly, Muhammad Ridho, et al. · E3S Web of Conferences (2025) | TGRS Research Map | TGRS