Abstract Lithium‐ion battery (LIB) energy storage systems play a significant role in the current energy storage transition. Globally, codes and standards are quickly incorporating a framework for safe design, siting, installation, commissioning, and decommissioning of battery energy storage systems (BESS). Full‐scale fire testing provides essential understanding of thermal runaway, fire, and explosion hazards associated with LIBs and BESSs. Engineers must then interpret that data to inform the site‐specific design, but there are cell, module, unit, and installation‐level data to decipher. Understanding the testing data and their limitations is critical for the design and operation of BESSs. Real‐life examples of where engineers misunderstood or misapplied test data will be presented to help bridge the knowledge gaps between stakeholders, industry, and engineers.

Authors

Institutions

Publication Details

Journal
Process Safety Progress
Published
2025-03-19
DOI
https://doi.org/10.1002/prs.12680
Citations
1
Primary Topic
Advanced Battery Technologies Research
Type
article
Field-Weighted Citation Impact
0.68
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Lessons learned from battery energy storage system (BESS) hazard analyses

Veronica Goldsmith
1 citations
Process Safety Progress
Advanced Battery Technologies Research
0.68
article

Lessons learned from battery energy storage system (BESS) hazard analyses

Veronica Goldsmith
article en
1 citations

Abstract

Abstract Lithium‐ion battery (LIB) energy storage systems play a significant role in the current energy storage transition. Globally, codes and standards are quickly incorporating a framework for safe design, siting, installation, commissioning, and decommissioning of battery energy storage systems (BESS). Full‐scale fire testing provides essential understanding of thermal runaway, fire, and explosion hazards associated with LIBs and BESSs. Engineers must then interpret that data to inform the site‐specific design, but there are cell, module, unit, and installation‐level data to decipher. Understanding the testing data and their limitations is critical for the design and operation of BESSs. Real‐life examples of where engineers misunderstood or misapplied test data will be presented to help bridge the knowledge gaps between stakeholders, industry, and engineers.

Process Safety ProgressVol. 44(2)
Arup Group (United States) (US)
Openalex Percentile: Top 33%
Advanced Battery Technologies Research
0.68
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.