BIM Uses for Mitigating Deficiencies in Road Scheduling Planning

Efficient scheduling is essential for successful and sustainable road construction projects. However, conventional planning approaches often lack adaptability, visualization, and integration with modern technologies, leading to schedule deficiencies and cost overruns. Therefore, this paper studies the influence of BIM uses in mitigating planning deficiencies in road construction scheduling. A four-stage research method was employed: (1) identification of BIM uses relevant to road projects, (2) determination of principal causes contributing to scheduling deficiencies, (3) cross-impact analysis to quantify BIM’s influence on these deficiencies, and (4) expert interviews to characterize key BIM uses. Results highlight that 4D construction planning, quantity take-off and cost estimation, and traffic management planning positively impact road scheduling, reducing errors in work breakdown structures, resource allocation, and coordination between project stakeholders. BIM streamlines communication, supports proactive risk management, and enables real-time schedule adjustments by providing an integrated digital environment. This research shows the advantages of applying BIM in road construction to improve project planning, curtail scheduling setbacks, and encourage adopting innovative practices. The results provide information that planners can utilize to enhance the use of BIM in scheduling road construction projects.

Authors

Institutions

Publication Details

Journal
Sustainability
Published
2025-03-19
DOI
https://doi.org/10.3390/su17062729
Citations
6
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
6.04

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

BIM Uses for Mitigating Deficiencies in Road Scheduling Planning

Guillermo Mejía, Omar Sánchez, Karen Castañeda, Rodrigo F. Herrera et al.
6 citations
Sustainability
BIM and Construction Integration
6.04
article

BIM Uses for Mitigating Deficiencies in Road Scheduling Planning

Guillermo Mejía, Omar Sánchez, Karen Castañeda, Rodrigo F. Herrera, Carlos A. Peña
article en
6 citations

Abstract

Efficient scheduling is essential for successful and sustainable road construction projects. However, conventional planning approaches often lack adaptability, visualization, and integration with modern technologies, leading to schedule deficiencies and cost overruns. Therefore, this paper studies the influence of BIM uses in mitigating planning deficiencies in road construction scheduling. A four-stage research method was employed: (1) identification of BIM uses relevant to road projects, (2) determination of principal causes contributing to scheduling deficiencies, (3) cross-impact analysis to quantify BIM’s influence on these deficiencies, and (4) expert interviews to characterize key BIM uses. Results highlight that 4D construction planning, quantity take-off and cost estimation, and traffic management planning positively impact road scheduling, reducing errors in work breakdown structures, resource allocation, and coordination between project stakeholders. BIM streamlines communication, supports proactive risk management, and enables real-time schedule adjustments by providing an integrated digital environment. This research shows the advantages of applying BIM in road construction to improve project planning, curtail scheduling setbacks, and encourage adopting innovative practices. The results provide information that planners can utilize to enhance the use of BIM in scheduling road construction projects.

SustainabilityVol. 17(6)
Universidad Industrial de Santander (CO), Pontificia Universidad Católica de Valparaíso (CL), Pontificia Universidad Javeriana (CO), Francisco de Paula Santander University (CO), Universitat Politècnica de València (ES)
Fondo Nacional de Desarrollo Científico y Tecnológico
Openalex Percentile: Top 4%
BIM and Construction Integration
6.04
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.