Specialised impounding plan of a rockfill dam after construction case study of Madani dam

To control and ensure the safety of the Madani Tabriz dam at the period 10 years after the end of construction, dam monitoring is performed utilising data from the instrumentation installed on the dam’s body. In this study, using the Midas finite element software, the results of the settlement, pore water pressure, and total stress of the Madani rockfill dam were calculated 10 years after the end of construction of the dam body and compared with the results of the instrumentation observation. The linear correlation coefficients between the data obtained from the sensors and the numerical analysis results for the items of settlement, pore water pressure, and total stress are 84%, 67%, and 99%, respectively. Sensitivity analyses were carried out for present special impounding programme for the dam, with controlling two simultaneous items: the pore water pressure and effect stress changes in the clay core, with 10 years passed since the completion of construction of the dam body. While controlling the reliability coefficient of the body stability, with a 30 cm/d reservoir impounding, the dam reservoir will be filled in 80 d. Suggest an impounding program for a reservoir behind an earth or rockfill dam, detailing a specific plan that ensures all safety aspects of the dam are controlled.

Authors

Institutions

Publication Details

Journal
Geotechnical Research
Published
2025-03-19
DOI
https://doi.org/10.1680/jgere.24.00050
Citations
2
Primary Topic
Dam Engineering and Safety
Type
article
Field-Weighted Citation Impact
1.91
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Specialised impounding plan of a rockfill dam after construction case study of Madani dam

Ramin Vafaei Poursorkhabi, Rasoul Farajniya
2 citations
Geotechnical Research
Dam Engineering and Safety
1.91
article

Specialised impounding plan of a rockfill dam after construction case study of Madani dam

Ramin Vafaei Poursorkhabi, Rasoul Farajniya
article en
2 citations

Abstract

To control and ensure the safety of the Madani Tabriz dam at the period 10 years after the end of construction, dam monitoring is performed utilising data from the instrumentation installed on the dam’s body. In this study, using the Midas finite element software, the results of the settlement, pore water pressure, and total stress of the Madani rockfill dam were calculated 10 years after the end of construction of the dam body and compared with the results of the instrumentation observation. The linear correlation coefficients between the data obtained from the sensors and the numerical analysis results for the items of settlement, pore water pressure, and total stress are 84%, 67%, and 99%, respectively. Sensitivity analyses were carried out for present special impounding programme for the dam, with controlling two simultaneous items: the pore water pressure and effect stress changes in the clay core, with 10 years passed since the completion of construction of the dam body. While controlling the reliability coefficient of the body stability, with a 30 cm/d reservoir impounding, the dam reservoir will be filled in 80 d. Suggest an impounding program for a reservoir behind an earth or rockfill dam, detailing a specific plan that ensures all safety aspects of the dam are controlled.

Geotechnical ResearchVol. 12(2)
Islamic Azad University of Tabriz (IR)
Openalex Percentile: Top 17%
Dam Engineering and Safety
1.91
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.