Developing a Hay method-based job evaluation model for human resource management in construction company

The construction company's rapid growth is demonstrated by the allocation of 10.79% of the state budget expenditure towards infrastructure development. In this context, human resources must be managed without relying on expertise certification as part of competency tests; instead, emphasis must be placed on skills, experience, and leadership ability as primary criteria. Therefore, this research aimed to build and develop a job evaluation model in construction companies using the Hay method to achieve better performance. The method was employed to conduct job evaluations in the literature review of previous results, books, and journals. The results showed that there was an impact on job evaluation arrangements to increase performance based on cost efficiency, quality, time safety, and environmental considerations. The salary system model was dependent on the Hay method, using points as a metric to distinguish between various levels. Meanwhile, the output was used as a reference for academics, stakeholders, and students in developing job evaluations.

Authors

Institutions

Publication Details

Journal
International Journal of Innovative Research and Scientific Studies
Published
2025-03-14
DOI
https://doi.org/10.53894/ijirss.v8i2.5425
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Developing a Hay method-based job evaluation model for human resource management in construction company

Ade Manggala Hardianto, Endah Murtiana Sari, Purwanto SK, Ce Gunawan et al.
International Journal of Innovative Research and Scientific Studies
Construction Project Management and Performance
article

Developing a Hay method-based job evaluation model for human resource management in construction company

Ade Manggala Hardianto, Endah Murtiana Sari, Purwanto SK, Ce Gunawan, Novi Hidayat
article en

Abstract

The construction company's rapid growth is demonstrated by the allocation of 10.79% of the state budget expenditure towards infrastructure development. In this context, human resources must be managed without relying on expertise certification as part of competency tests; instead, emphasis must be placed on skills, experience, and leadership ability as primary criteria. Therefore, this research aimed to build and develop a job evaluation model in construction companies using the Hay method to achieve better performance. The method was employed to conduct job evaluations in the literature review of previous results, books, and journals. The results showed that there was an impact on job evaluation arrangements to increase performance based on cost efficiency, quality, time safety, and environmental considerations. The salary system model was dependent on the Hay method, using points as a metric to distinguish between various levels. Meanwhile, the output was used as a reference for academics, stakeholders, and students in developing job evaluations.

International Journal of Innovative Research and Scientific StudiesVol. 8(2)
President University (ID), Universitas Esa Unggul (ID), Universitas Islam 45 Bekasi (ID)
Openalex Percentile: Top 94%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Developing a Hay method-based job evaluation model for human resource management in construction company — Ade Manggala Hardianto, Endah Murtiana Sari, et al. · International Journal of Innovative Research and Scientific Studies (2025) | TGRS Research Map | TGRS