Theoretical and Experimental Analysis of Stress Variations in Precast Concrete Segment Linings during Double-Shield TBM Excavation of Subway Tunnels

During double-shield tunnel boring machine (DS-TBM) excavation of urban subway tunnels, backfilling with pea gravel and grouting is usually performed behind segment wall linings. However, insufficient pea gravel backfill and delayed grouting compromise segment stability, leading to issues such as dislocation, damage, and groundwater leakage. This study developed a simplified cantilever-type Timoshenko beam model to analyze segment stresses during DS-TBM construction. Numerical solutions for the deflection and internal forces of the tunnel structure were obtained using the finite-difference method. An experimental evaluation was performed to assess stress variations in segments during construction. Theoretical results were then compared with field data indicating that the model slightly underestimated the observed segment settlements. Subsequent optimization of the model suggests adjustments to account for plastic-stage tunnel deformation and construction-related disturbances. The optimal correction coefficient values were determined as follows: kc=0.85 (longitudinal stress), kl=0.91 (axial stress), and ks=1.0 (radial stress). Field tests identified three stress variation stages in segments: (1) inadequate pea gravel backfill, (2) full pea gravel backfill (pre-grouting), and (3) post-grouting with the second stage contributing most to settlement. Consequently, practical recommendations include improving the pea gravel backfill quality and adopting advanced and stepwise grouting techniques to control segment settlements. The primary contribution of this study lies in its focus on stress and stability control of segmental tunnels during the construction of DS-TBM. This research offers detailed recommendations and strategies aimed at enhancing segment stability, emphasizing the importance of engineering construction and site management. In addition, it provides valuable insights to advance the technology associated with DS-TBM tunnel construction.

Authors

Institutions

Publication Details

Journal
Journal of Construction Engineering and Management
Published
2025-03-18
DOI
https://doi.org/10.1061/jcemd4.coeng-16227
Primary Topic
Tunneling and Rock Mechanics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Theoretical and Experimental Analysis of Stress Variations in Precast Concrete Segment Linings during Double-Shield TBM Excavation of Subway Tunnels

Lihui Wang, Shouhui Wang, Pengfei Li, Xing Yang et al.
Journal of Construction Engineering and Management
Tunneling and Rock Mechanics
article

Theoretical and Experimental Analysis of Stress Variations in Precast Concrete Segment Linings during Double-Shield TBM Excavation of Subway Tunnels

Lihui Wang, Shouhui Wang, Pengfei Li, Xing Yang, Shanyong Wang, Yusheng Jiang
article en

Abstract

During double-shield tunnel boring machine (DS-TBM) excavation of urban subway tunnels, backfilling with pea gravel and grouting is usually performed behind segment wall linings. However, insufficient pea gravel backfill and delayed grouting compromise segment stability, leading to issues such as dislocation, damage, and groundwater leakage. This study developed a simplified cantilever-type Timoshenko beam model to analyze segment stresses during DS-TBM construction. Numerical solutions for the deflection and internal forces of the tunnel structure were obtained using the finite-difference method. An experimental evaluation was performed to assess stress variations in segments during construction. Theoretical results were then compared with field data indicating that the model slightly underestimated the observed segment settlements. Subsequent optimization of the model suggests adjustments to account for plastic-stage tunnel deformation and construction-related disturbances. The optimal correction coefficient values were determined as follows: kc=0.85 (longitudinal stress), kl=0.91 (axial stress), and ks=1.0 (radial stress). Field tests identified three stress variation stages in segments: (1) inadequate pea gravel backfill, (2) full pea gravel backfill (pre-grouting), and (3) post-grouting with the second stage contributing most to settlement. Consequently, practical recommendations include improving the pea gravel backfill quality and adopting advanced and stepwise grouting techniques to control segment settlements. The primary contribution of this study lies in its focus on stress and stability control of segmental tunnels during the construction of DS-TBM. This research offers detailed recommendations and strategies aimed at enhancing segment stability, emphasizing the importance of engineering construction and site management. In addition, it provides valuable insights to advance the technology associated with DS-TBM tunnel construction.

Journal of Construction Engineering and ManagementVol. 151(6)
China University of Mining and Technology (CN), Beijing University of Technology (CN), Guangzhou Metro Group (China) (CN)
Sustainable cities and communities
Openalex Percentile: Top 95%
Tunneling and Rock Mechanics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.