Evaluating the build-own-operate model for nuclear power plant projects; A case study of Türkiye’s first nuclear power plant agreement with Russia

This paper evaluates the Build-Own-Operate (BOO) model for nuclear power plant projects, using Türkiye's first nuclear power plant agreement with Russia as a case study. Nuclear energy is crucial for addressing global energy demands due to its reliable baseload power and zero greenhouse gas emissions. However, the industry faces significant challenges, including high costs and long commissioning times, which are influenced by contracting types. Traditional models like turnkey, split package, and multi-contracts present several limitations in terms of payment structure, cost, technology, and knowledge transfer. The BOO model offers an alternative, where the contractor is responsible for the design, commissioning, ownership, and operation of the plant throughout its operational life. This approach can lead to timely project completion, deferred payment obligations, and reduced operational risk but requires careful consideration of potential drawbacks such as knowledge transfer, cost control, and long-term operational dependence. The Akkuyu Nuclear Power Plant in Türkiye, developed under an agreement with Russia, is the world's first nuclear power plant implemented through this new model. This project highlights the innovative nature of the BOO model, detailing the benefits and challenges faced, including technology and knowledge transfer, cost structures, and localization efforts. The study provides a comprehensive analysis of the BOO model’s potential in the nuclear industry and offers valuable lessons for future nuclear power projects globally.

Authors

Institutions

Publication Details

Journal
International Journal of Energy Studies
Published
2025-03-18
DOI
https://doi.org/10.58559/ijes.1533604
Citations
3
Primary Topic
Nuclear reactor physics and engineering
Type
article
Field-Weighted Citation Impact
14.98
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Evaluating the build-own-operate model for nuclear power plant projects; A case study of Türkiye’s first nuclear power plant agreement with Russia

Mahmut Cüneyt Kahraman
3 citations
International Journal of Energy Studies
Nuclear reactor physics and engineering
14.98
article

Evaluating the build-own-operate model for nuclear power plant projects; A case study of Türkiye’s first nuclear power plant agreement with Russia

Mahmut Cüneyt Kahraman
article en
3 citations

Abstract

This paper evaluates the Build-Own-Operate (BOO) model for nuclear power plant projects, using Türkiye's first nuclear power plant agreement with Russia as a case study. Nuclear energy is crucial for addressing global energy demands due to its reliable baseload power and zero greenhouse gas emissions. However, the industry faces significant challenges, including high costs and long commissioning times, which are influenced by contracting types. Traditional models like turnkey, split package, and multi-contracts present several limitations in terms of payment structure, cost, technology, and knowledge transfer. The BOO model offers an alternative, where the contractor is responsible for the design, commissioning, ownership, and operation of the plant throughout its operational life. This approach can lead to timely project completion, deferred payment obligations, and reduced operational risk but requires careful consideration of potential drawbacks such as knowledge transfer, cost control, and long-term operational dependence. The Akkuyu Nuclear Power Plant in Türkiye, developed under an agreement with Russia, is the world's first nuclear power plant implemented through this new model. This project highlights the innovative nature of the BOO model, detailing the benefits and challenges faced, including technology and knowledge transfer, cost structures, and localization efforts. The study provides a comprehensive analysis of the BOO model’s potential in the nuclear industry and offers valuable lessons for future nuclear power projects globally.

International Journal of Energy StudiesVol. 10(1)
Sustainable Energy Systems (United Kingdom) (GB)
Openalex Percentile: Top 2%
Nuclear reactor physics and engineering
14.98
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Evaluating the build-own-operate model for nuclear power plant projects; A case study of Türkiye’s first nuclear power plant agreement with Russia — Mahmut Cüneyt Kahraman · International Journal of Energy Studies (2025) | TGRS Research Map | TGRS