Key technology of pipe jacking construction in low temperature and cold area

Abstract With the development of pipe jacking technology, it has been widely used all over the country. Usually, the construction of slurry balanced pipe jacking will avoid the construction in cold winter areas. However, with the continuous breakthrough of pipe jacking length, in order to not interrupt the construction, necessary measures will be taken to carry out pipe jacking construction in severe cold areas in winter under special circumstances. Based on the construction of Jiaoliu River non‐pressure tunnel jacking project in the tunnel section of Yinchao‐Jiliao Water Conveyance Project, this paper introduces the key technologies of winter construction of pipe jacking project, including the construction of thermal insulation shed, boiler heat calculation, pipeline thermal insulation measures, mud heating system, etc., and carries out temperature monitoring in each position of pipe jacking pipe and thermal insulation shed, which verifies the feasibility of winter construction scheme of slurry balance pipe jacking, and provides reference for subsequent pipe jacking projects in similar cold regions.

Authors

Institutions

Publication Details

Journal
ce/papers
Published
2025-03-01
DOI
https://doi.org/10.1002/cepa.3205
Primary Topic
Tunneling and Rock Mechanics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Key technology of pipe jacking construction in low temperature and cold area

Zhengyong Zhang, Tianshuo Xu, Wenxue Wang, Lijun Hao et al.
ce/papers
Tunneling and Rock Mechanics
article

Key technology of pipe jacking construction in low temperature and cold area

Zhengyong Zhang, Tianshuo Xu, Wenxue Wang, Lijun Hao, Peng Ye, Yunfei Zhao, Fei Luo, Shenghua Chen, Liang Xiong
article en

Abstract

Abstract With the development of pipe jacking technology, it has been widely used all over the country. Usually, the construction of slurry balanced pipe jacking will avoid the construction in cold winter areas. However, with the continuous breakthrough of pipe jacking length, in order to not interrupt the construction, necessary measures will be taken to carry out pipe jacking construction in severe cold areas in winter under special circumstances. Based on the construction of Jiaoliu River non‐pressure tunnel jacking project in the tunnel section of Yinchao‐Jiliao Water Conveyance Project, this paper introduces the key technologies of winter construction of pipe jacking project, including the construction of thermal insulation shed, boiler heat calculation, pipeline thermal insulation measures, mud heating system, etc., and carries out temperature monitoring in each position of pipe jacking pipe and thermal insulation shed, which verifies the feasibility of winter construction scheme of slurry balance pipe jacking, and provides reference for subsequent pipe jacking projects in similar cold regions.

ce/papersVol. 8(2)
China University of Geosciences (CN)
Openalex Percentile: Top 95%
Tunneling and Rock Mechanics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Key technology of pipe jacking construction in low temperature and cold area — Zhengyong Zhang, Tianshuo Xu, et al. · ce/papers (2025) | TGRS Research Map | TGRS