A Digital Twin‐based Intelligent Concrete Placing Technology

ABSTRACT An intelligent concrete placing control model was created by the authors to achieve this goal. Using the placing and control content as the physical object (PO), a BIM virtual model as the twin carrier (VE), two‐way twin data as the core (DD), coordinated control as the target (WM), and coordinated operational rules (RULE) as the driver. Additionally, they created a “IoT monitoring, BIM digitalization, dynamic analysis, and central control” integrated smart concrete transportation control platform for the construction of an ultra‐high arch dam, as well as a smart monitoring device covering the entire transportation, spreading, and vibration of the entire concrete. As a result, the entire placement procedure can be intelligently managed. These achievements have been used to create excellent, safe, and effective concrete works for the Wudongde and Baihetan dams.

Authors

Publication Details

Journal
ce/papers
Published
2025-03-01
DOI
https://doi.org/10.1002/cepa.3211
Citations
1
Primary Topic
Applied Advanced Technologies
Type
article
Field-Weighted Citation Impact
1.24
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Digital Twin‐based Intelligent Concrete Placing Technology

Cui Huang, Jianjiang Xu, Yu Zhu, Guo Zhong
1 citations
ce/papers
Applied Advanced Technologies
1.24
article

A Digital Twin‐based Intelligent Concrete Placing Technology

Cui Huang, Jianjiang Xu, Yu Zhu, Guo Zhong
article en
1 citations

Abstract

ABSTRACT An intelligent concrete placing control model was created by the authors to achieve this goal. Using the placing and control content as the physical object (PO), a BIM virtual model as the twin carrier (VE), two‐way twin data as the core (DD), coordinated control as the target (WM), and coordinated operational rules (RULE) as the driver. Additionally, they created a “IoT monitoring, BIM digitalization, dynamic analysis, and central control” integrated smart concrete transportation control platform for the construction of an ultra‐high arch dam, as well as a smart monitoring device covering the entire transportation, spreading, and vibration of the entire concrete. As a result, the entire placement procedure can be intelligently managed. These achievements have been used to create excellent, safe, and effective concrete works for the Wudongde and Baihetan dams.

ce/papersVol. 8(2)
Openalex Percentile: Top 21%
Applied Advanced Technologies
1.24
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.