Monitoring and Analysis of System Transition in the Closure Joint Using the Segment‐jacking Method

Abstract The closure joint using the segment‐jacking method adopted in the Dalian Bay Tunnel marks the inaugural application of a novel closure joint configuration in China's immersed tube tunnel industry. The structural system transition phase of this method poses notable safety risks and is pivotal to the success of the segment‐jacking method. To tackle challenges such as the difficulty in inspecting the installation quality of steel braces and the heightened construction risks associated with the system transition process, this paper builds upon an analysis of the mechanical forces involved during the system transition. By establishing a monitoring system and leveraging preload tests to assess the load‐bearing capacity of steel braces, this study pools data on the rebound of waterstop seals and the deformation of steel braces during the structural system transition of the closure joint using the segment‐jacking method. This approach ensures that the structural safety of the transition process is controllable, thereby paving the way for the broader adoption of the closure joint technology in the segment‐jacking method.

Authors

Institutions

Publication Details

Journal
ce/papers
Published
2025-03-01
DOI
https://doi.org/10.1002/cepa.3168
Primary Topic
Advanced Measurement and Metrology Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Monitoring and Analysis of System Transition in the Closure Joint Using the Segment‐jacking Method

C. Liu, Jian Yu, Wenhao Sun, Zhao Liu
ce/papers
Advanced Measurement and Metrology Techniques
article

Monitoring and Analysis of System Transition in the Closure Joint Using the Segment‐jacking Method

C. Liu, Jian Yu, Wenhao Sun, Zhao Liu
article en

Abstract

Abstract The closure joint using the segment‐jacking method adopted in the Dalian Bay Tunnel marks the inaugural application of a novel closure joint configuration in China's immersed tube tunnel industry. The structural system transition phase of this method poses notable safety risks and is pivotal to the success of the segment‐jacking method. To tackle challenges such as the difficulty in inspecting the installation quality of steel braces and the heightened construction risks associated with the system transition process, this paper builds upon an analysis of the mechanical forces involved during the system transition. By establishing a monitoring system and leveraging preload tests to assess the load‐bearing capacity of steel braces, this study pools data on the rebound of waterstop seals and the deformation of steel braces during the structural system transition of the closure joint using the segment‐jacking method. This approach ensures that the structural safety of the transition process is controllable, thereby paving the way for the broader adoption of the closure joint technology in the segment‐jacking method.

ce/papersVol. 8(2)
Shanghai Tunnel Engineering (China) (CN), Shanghai Harbour Engineering Design & Research Institute (CN)
Openalex Percentile: Top 95%
Advanced Measurement and Metrology Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Monitoring and Analysis of System Transition in the Closure Joint Using the Segment‐jacking Method — C. Liu, Jian Yu, et al. · ce/papers (2025) | TGRS Research Map | TGRS