Multi Stage Cable Force Optimization Algorithm for Cable‐stayed Bridges Based on Influence Matrix Method

Abstract In order to achieve a reasonable completion state of large‐span cable‐stayed bridges and ensure that the bridge alignment, cable force, and tower deviation meet the requirements after closure, an optimization algorithm for cable force adjustment during the construction stage of large‐span cable‐stayed bridges based on the influence matrix method is proposed. Taking the Yangmeizhou Bridge in Xiangtan, Hunan as the background project, optimization objective functions and boundary conditions are established for two types of elevation deviations during the construction process, and the sequential least squares quadratic programming method is used to iteratively calculate the optimization model. Based on engineering measurements and finite element calculations, the key section for cable adjustment was selected and the optimal cable adjustment scheme was determined. The results showed that the proposed optimization model can meet the requirements of cable force adjustment during the construction phase of long‐span cable‐stayed bridges, the implementation path is clear and easy to implement. Compared with traditional empirical adjustment methods, it has better applicability and interpretability.

Authors

Institutions

Publication Details

Journal
ce/papers
Published
2025-03-01
DOI
https://doi.org/10.1002/cepa.3233
Citations
2
Primary Topic
Structural Engineering and Vibration Analysis
Type
article
Field-Weighted Citation Impact
1.91
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Multi Stage Cable Force Optimization Algorithm for Cable‐stayed Bridges Based on Influence Matrix Method

Sicheng Zhou, Jian Guo Yang, Laifa Wang, Changfu Zou
2 citations
ce/papers
Structural Engineering and Vibration Analysis
1.91
article

Multi Stage Cable Force Optimization Algorithm for Cable‐stayed Bridges Based on Influence Matrix Method

Sicheng Zhou, Jian Guo Yang, Laifa Wang, Changfu Zou
article en
2 citations

Abstract

Abstract In order to achieve a reasonable completion state of large‐span cable‐stayed bridges and ensure that the bridge alignment, cable force, and tower deviation meet the requirements after closure, an optimization algorithm for cable force adjustment during the construction stage of large‐span cable‐stayed bridges based on the influence matrix method is proposed. Taking the Yangmeizhou Bridge in Xiangtan, Hunan as the background project, optimization objective functions and boundary conditions are established for two types of elevation deviations during the construction process, and the sequential least squares quadratic programming method is used to iteratively calculate the optimization model. Based on engineering measurements and finite element calculations, the key section for cable adjustment was selected and the optimal cable adjustment scheme was determined. The results showed that the proposed optimization model can meet the requirements of cable force adjustment during the construction phase of long‐span cable‐stayed bridges, the implementation path is clear and easy to implement. Compared with traditional empirical adjustment methods, it has better applicability and interpretability.

ce/papersVol. 8(2)
Shanghai Jiao Tong University (CN), Shanghai Harbour Engineering Design & Research Institute (CN), Shanghai Construction Group (China) (CN)
Openalex Percentile: Top 17%
Structural Engineering and Vibration Analysis
1.91
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.