Mechanism of Overbreak and Underbreak Induced by Tunnel Blasting and Control Methods

Abstract Controlling overbreak and underbreak during tunnel blasting is a critical challenge, as it directly impacts excavation quality and safety. This study provides an in‐depth analysis of the effects of surrounding rock geology, cross‐section specifications, and construction conditions on overbreak and underbreak. The mechanisms underlying blasting‐induced overbreak and underbreak are elucidated, revealing that conventional methods—such as controlling drilling angles and ensuring appropriate charge spacing—remain limited, particularly for long advances. To address these limitations, this study introduces a geometric control method employing both long and short holes, with derived theoretical formulas. Case study validations demonstrate that this computerized control method can swiftly determine critical parameters such as collar positions, drilling angles, and hole lengths, offering precise theoretical guidance for on‐site drilling operations. The proposed method has shown significant effectiveness in controlling over‐break and underbreak.

Authors

Institutions

Publication Details

Journal
ce/papers
Published
2025-03-01
DOI
https://doi.org/10.1002/cepa.3237
Primary Topic
Tunneling and Rock Mechanics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Mechanism of Overbreak and Underbreak Induced by Tunnel Blasting and Control Methods

Xiaoyong He, Jian Wu, Yuhui Fan, Qinghua Xiao et al.
ce/papers
Tunneling and Rock Mechanics
article

Mechanism of Overbreak and Underbreak Induced by Tunnel Blasting and Control Methods

Xiaoyong He, Jian Wu, Yuhui Fan, Qinghua Xiao, Yin Pan, Xiaochun Yang, Di Qu
article en

Abstract

Abstract Controlling overbreak and underbreak during tunnel blasting is a critical challenge, as it directly impacts excavation quality and safety. This study provides an in‐depth analysis of the effects of surrounding rock geology, cross‐section specifications, and construction conditions on overbreak and underbreak. The mechanisms underlying blasting‐induced overbreak and underbreak are elucidated, revealing that conventional methods—such as controlling drilling angles and ensuring appropriate charge spacing—remain limited, particularly for long advances. To address these limitations, this study introduces a geometric control method employing both long and short holes, with derived theoretical formulas. Case study validations demonstrate that this computerized control method can swiftly determine critical parameters such as collar positions, drilling angles, and hole lengths, offering precise theoretical guidance for on‐site drilling operations. The proposed method has shown significant effectiveness in controlling over‐break and underbreak.

ce/papersVol. 8(2)
China Railway Group (China) (CN), Southwest Jiaotong University (CN)
Openalex Percentile: Top 95%
Tunneling and Rock Mechanics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics