Research on Geological Conditions and Construction Settlement in NEOM Area of Saudi Arabia

Abstract With the proposal of China's “Belt and Road” policy and Saudi Arabia's “NEOM New City” construction plan, China and Saudi Arabia have formed a close cooperative relationship in engineering construction. However, in recent years, delays in projects in Saudi Arabia have been common. Saudi Arabia, as an unfamiliar overseas environment, is full of difficulties and challenges for the Chinese design and construction team. This study summarizes the overall engineering geological conditions in the NEOM area by analyzing the geological exploration results of a project, which is 150 km water supply pipeline project across the NEOM area. The results show that the NEOM area is mainly gravel soil, sandy soil and rock. The soil is in a dense state with good particle gradation and the rock compressive strength is low. The soil is highly corrosive by local standards. Under the load of 100 kPa, the minimum central settlement value is 30.5 mm and the maximum is 69.3 mm.

Authors

Institutions

Publication Details

Journal
ce/papers
Published
2025-03-01
DOI
https://doi.org/10.1002/cepa.3154
Primary Topic
Underground infrastructure and sustainability
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on Geological Conditions and Construction Settlement in NEOM Area of Saudi Arabia

Qingsong Shen, H WAN, Wei Yan, S. L. HUANG
ce/papers
Underground infrastructure and sustainability
article

Research on Geological Conditions and Construction Settlement in NEOM Area of Saudi Arabia

Qingsong Shen, H WAN, Wei Yan, S. L. HUANG
article en

Abstract

Abstract With the proposal of China's “Belt and Road” policy and Saudi Arabia's “NEOM New City” construction plan, China and Saudi Arabia have formed a close cooperative relationship in engineering construction. However, in recent years, delays in projects in Saudi Arabia have been common. Saudi Arabia, as an unfamiliar overseas environment, is full of difficulties and challenges for the Chinese design and construction team. This study summarizes the overall engineering geological conditions in the NEOM area by analyzing the geological exploration results of a project, which is 150 km water supply pipeline project across the NEOM area. The results show that the NEOM area is mainly gravel soil, sandy soil and rock. The soil is in a dense state with good particle gradation and the rock compressive strength is low. The soil is highly corrosive by local standards. Under the load of 100 kPa, the minimum central settlement value is 30.5 mm and the maximum is 69.3 mm.

ce/papersVol. 8(2)
PowerChina (China) (CN), Powerchina Huadong Engineering Corporation (China) (CN)
Openalex Percentile: Top 95%
Underground infrastructure and sustainability
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.