Abstract In the process of excavation, the soil pressure on both sides of the foundation pit gradually increases, which will cause deformation of the enclosure structure. Steel support plays an active role in reducing the deformation of the enclosure structure. In order to explore the influence of pre‐stress of steel support on the deformation of ground connecting wall in foundation pit engineering, this paper takes a subway foundation pit under construction in Nanjing Metro as an example by numerical simulation, and discusses the change law of ground connecting wall during excavation and the influence of steel support on the maximum deformation of ground connecting wall under different pre‐stress. The analysis shows that with the increase of excavation depth, the displacement of ground connecting wall increases gradually. When the axial stress of the steel support is applied, the deformation of the enclosure structure can be effectively reduced. When the axial stress of the steel support is increased, the maximum displacement of the ground connecting wall gradually decreases, which is approximately linear.

Authors

Institutions

Publication Details

Journal
ce/papers
Published
2025-03-01
DOI
https://doi.org/10.1002/cepa.3145
Primary Topic
Geotechnical Engineering and Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Study on the Influence of Pre‐Stress of Steel Support on Deformation of Ground Connecting Wall in Foundation Pit Engineering

Kunyong Zhang, Xiaopeng Zhao, Bibo Zhong, Zihao Li
ce/papers
Geotechnical Engineering and Analysis
article

Study on the Influence of Pre‐Stress of Steel Support on Deformation of Ground Connecting Wall in Foundation Pit Engineering

Kunyong Zhang, Xiaopeng Zhao, Bibo Zhong, Zihao Li
article en

Abstract

Abstract In the process of excavation, the soil pressure on both sides of the foundation pit gradually increases, which will cause deformation of the enclosure structure. Steel support plays an active role in reducing the deformation of the enclosure structure. In order to explore the influence of pre‐stress of steel support on the deformation of ground connecting wall in foundation pit engineering, this paper takes a subway foundation pit under construction in Nanjing Metro as an example by numerical simulation, and discusses the change law of ground connecting wall during excavation and the influence of steel support on the maximum deformation of ground connecting wall under different pre‐stress. The analysis shows that with the increase of excavation depth, the displacement of ground connecting wall increases gradually. When the axial stress of the steel support is applied, the deformation of the enclosure structure can be effectively reduced. When the axial stress of the steel support is increased, the maximum displacement of the ground connecting wall gradually decreases, which is approximately linear.

ce/papersVol. 8(2)
Hohai University (CN), Shanghai Tunnel Engineering (China) (CN)
Openalex Percentile: Top 95%
Geotechnical Engineering and Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.