The Electricity Generation Landscape of Bioenergy in Germany

Disaggregated data on electricity generation from bioenergy are very helpful for investigating the economic and technical effects of this form of renewable energy on the German power sector with a high temporal and spatial resolution. But the lack of high-resolution feed-in data for Germany makes it necessary to apply numerical simulations to determine the electricity generation from biomass power plants for a time period and geographic region of interest. This article presents how such a simulation model can be developed using public power plant data as well as open information from German TSOs as input data. The physical model is applied to an ensemble of 20,863 biomass power plants, most of which are in continuous operation, to simulate their electricity generation in Germany for the year 2020. For this period, the spatially aggregated simulation results correlate well with the official electricity feed-in from bioenergy. The disaggregated time series can be used to analyze the electricity generation at any spatial scale, as each power plant is simulated with its technical parameters and geographical location. Furthermore, this article introduces the electricity generation landscape of bioenergy as a high-resolution map and at the federal state level with meaningful energy figures, enabling comprehensive assessments of this form of renewable energy for different regions of Germany.

Authors

Institutions

Publication Details

Journal
Energies
Published
2025-03-18
DOI
https://doi.org/10.3390/en18061497
Citations
2
Primary Topic
Integrated Energy Systems Optimization
Type
article
Field-Weighted Citation Impact
1.46
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The Electricity Generation Landscape of Bioenergy in Germany

Reinhold Lehneis
2 citations
Energies
Integrated Energy Systems Optimization
1.46
article

The Electricity Generation Landscape of Bioenergy in Germany

Reinhold Lehneis
article en
2 citations

Abstract

Disaggregated data on electricity generation from bioenergy are very helpful for investigating the economic and technical effects of this form of renewable energy on the German power sector with a high temporal and spatial resolution. But the lack of high-resolution feed-in data for Germany makes it necessary to apply numerical simulations to determine the electricity generation from biomass power plants for a time period and geographic region of interest. This article presents how such a simulation model can be developed using public power plant data as well as open information from German TSOs as input data. The physical model is applied to an ensemble of 20,863 biomass power plants, most of which are in continuous operation, to simulate their electricity generation in Germany for the year 2020. For this period, the spatially aggregated simulation results correlate well with the official electricity feed-in from bioenergy. The disaggregated time series can be used to analyze the electricity generation at any spatial scale, as each power plant is simulated with its technical parameters and geographical location. Furthermore, this article introduces the electricity generation landscape of bioenergy as a high-resolution map and at the federal state level with meaningful energy figures, enabling comprehensive assessments of this form of renewable energy for different regions of Germany.

EnergiesVol. 18(6)
Helmholtz Centre for Environmental Research (DE)
Openalex Percentile: Top 19%
Integrated Energy Systems Optimization
1.46
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.