Analyzing cost impacts across the entire process of prefabricated building components from design to application

This study examines cost control challenges in prefabricated building construction, focusing on the design, production, transportation, and installation phases. A conceptual framework was developed through a literature review, and structural equation models were constructed using SPSS and AMOS based on data from Chinese prefabricated building firms. This study provides a holistic perspective on cost control in the prefabrication construction phase. The findings reveal that increased investment in design significantly reduces costs in subsequent phases, with design having the greatest impact on cost control. Production and installation have similar effects on overall costs, while transportation has the least impact. Key factors influencing cost management include prefabrication efficiency, IT proficiency, production scale, loading strategy, and installation complexity. By emphasizing the strategic role of design and production investments, this study delivers novel insights and practical recommendations for optimizing costs, offering decision-making support for improving cost efficiency in prefabricated buildings. These findings make a significant contribution to advancing research and industry practices in prefabricated building cost management.

Authors

Institutions

Publication Details

Journal
Scientific Reports
Published
2025-03-18
DOI
https://doi.org/10.1038/s41598-025-92786-z
Citations
7
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
7.04
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analyzing cost impacts across the entire process of prefabricated building components from design to application

Kuo-Tai Cheng, Liang Qiao, Hsing-Wei Tai, Teng Wang et al.
7 citations
Scientific Reports
BIM and Construction Integration
7.04
article

Analyzing cost impacts across the entire process of prefabricated building components from design to application

Kuo-Tai Cheng, Liang Qiao, Hsing-Wei Tai, Teng Wang, Lin Liu
article en
7 citations

Abstract

This study examines cost control challenges in prefabricated building construction, focusing on the design, production, transportation, and installation phases. A conceptual framework was developed through a literature review, and structural equation models were constructed using SPSS and AMOS based on data from Chinese prefabricated building firms. This study provides a holistic perspective on cost control in the prefabrication construction phase. The findings reveal that increased investment in design significantly reduces costs in subsequent phases, with design having the greatest impact on cost control. Production and installation have similar effects on overall costs, while transportation has the least impact. Key factors influencing cost management include prefabrication efficiency, IT proficiency, production scale, loading strategy, and installation complexity. By emphasizing the strategic role of design and production investments, this study delivers novel insights and practical recommendations for optimizing costs, offering decision-making support for improving cost efficiency in prefabricated buildings. These findings make a significant contribution to advancing research and industry practices in prefabricated building cost management.

Scientific ReportsVol. 15(1)
Beijing Jiaotong University (CN), National Tsing Hua University (TW), China Communications Construction Company (China) (CN)
Openalex Percentile: Top 3%
BIM and Construction Integration
7.04
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analyzing cost impacts across the entire process of prefabricated building components from design to application — Kuo-Tai Cheng, Liang Qiao, et al. · Scientific Reports (2025) | TGRS Research Map | TGRS