Progress management of prefabricated construction projects based on combination of machine learning and multi-objective optimization

Abstract The high speed of implementation of prefabricated constructions has caused them to become one of the most popular and widely used construction elements today. Prefabricated construction projects are sensitive to uncertainties that may cause delays in project progress due to the need for high coordination and interdependence between installation activities. Hence, it is essential to monitor the progress of the installation to avoid actual project delays. Separating the prefabricated module from the environment, recognizing its type and also identifying its installation mode are three essential prerequisites for managing the progress of construction projects based on prefabricated modules. Considering the variety of separation of prefabricated modules from the environment, and the difficulty of identifying its type as well as identifying the installation mode of each module, a new method with three basic steps was used in this study. These three actions consist of the following: (1) use of NSGA-II to frame segmentation and determine regions of interest; (2) module type identification using Convolutional Neural Network (CNN) and Cuckoo Search Optimization (CSO) in conjunction; (3) a combination of CNN and CSO used to evaluate the installation quality in each category of modules. The case study's findings demonstrated that, in both the prefabricated module type identification and progress analysis stages, the suggested approach outperformed alternative models in terms of accuracy, precision, recall, and F-Measure indices. The suggested model's superiority over the compared models is further supported by the receiver operating characteristic analysis.

Authors

Institutions

Publication Details

Journal
International Journal of Low-Carbon Technologies
Published
2025-01-01
DOI
https://doi.org/10.1093/ijlct/ctae207
Citations
2
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
2.01
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Progress management of prefabricated construction projects based on combination of machine learning and multi-objective optimization

Zeng Zhao, Ying Gao
2 citations
International Journal of Low-Carbon Technologies
BIM and Construction Integration
2.01
article

Progress management of prefabricated construction projects based on combination of machine learning and multi-objective optimization

Zeng Zhao, Ying Gao
article en
2 citations

Abstract

Abstract The high speed of implementation of prefabricated constructions has caused them to become one of the most popular and widely used construction elements today. Prefabricated construction projects are sensitive to uncertainties that may cause delays in project progress due to the need for high coordination and interdependence between installation activities. Hence, it is essential to monitor the progress of the installation to avoid actual project delays. Separating the prefabricated module from the environment, recognizing its type and also identifying its installation mode are three essential prerequisites for managing the progress of construction projects based on prefabricated modules. Considering the variety of separation of prefabricated modules from the environment, and the difficulty of identifying its type as well as identifying the installation mode of each module, a new method with three basic steps was used in this study. These three actions consist of the following: (1) use of NSGA-II to frame segmentation and determine regions of interest; (2) module type identification using Convolutional Neural Network (CNN) and Cuckoo Search Optimization (CSO) in conjunction; (3) a combination of CNN and CSO used to evaluate the installation quality in each category of modules. The case study's findings demonstrated that, in both the prefabricated module type identification and progress analysis stages, the suggested approach outperformed alternative models in terms of accuracy, precision, recall, and F-Measure indices. The suggested model's superiority over the compared models is further supported by the receiver operating characteristic analysis.

International Journal of Low-Carbon TechnologiesVol. 20
Zhejiang DongFang Vocational and Technical College (CN)
Openalex Percentile: Top 16%
BIM and Construction Integration
2.01
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Progress management of prefabricated construction projects based on combination of machine learning and multi-objective optimization — Zeng Zhao, Ying Gao · International Journal of Low-Carbon Technologies (2025) | TGRS Research Map | TGRS