THE FINANCIAL AND ECONOMIC RISKS IN THE RISK ASSESSMENT MODEL MADE FOR WASTEWATER TREATMENT PLANT
This paper analyses the financial and economic risks in the risk assessment model made for wastewater treatment plants. This group of risks was identified during the doctoral research conducted with the Delphi method. In the risk assessment model, six groups of risks are identified and evaluated within a team of the Delphi method: legal, financial and economic, logistics, environmental protection, management, and design risks. The financial and economic risk group has five identified risks. These risks are specified after the literature review and previous project experiences. The importance of identification of these risks is making the adequate risk response.
Authors
- Andrea Ivanišević (ORCID: https://orcid.org/0000-0003-3342-7257)
- Jovana Topalić Marković (ORCID: https://orcid.org/0000-0001-7854-3257)
- Vladimir Mučenski (ORCID: https://orcid.org/0000-0001-9830-4747)
Publication Details
- Published
- 2025-01-01
- DOI
- https://doi.org/10.24867/future-bme-2024-110
- Primary Topic
- Multi-Criteria Decision Making
- Type
- article
- Field-Weighted Citation Impact
- 0.00