Geotechnical treatment analysis for headrace tunnel in gneissic rock mass

This article presents the methodology adopted for the geotechnical design of the support applied to the headrace tunnels of the Laúca Hydropower Plant (AHE Laúca), located in Angola. The plant's headrace system consists of six parallel tunnels, each with an average length of 1900 meters, excavated in a gneissic rock mass. To determine the supports required to maintain excavation stability during the construction phase and the plant's operation, geological and geotechnical tests and investigations were conducted. The results of these investigations supported the studies presented here, providing parameters such as compressive strength and deformability of the rock mass, as well as shear strength of the rock mass discontinuities. The definition of appropriate support to ensure excavation stability was based on the Q-system rock mass classification. After the preliminary design of the support for excavations in competent rock mass, classified as Classes I to III, the proposed support was subjected to verification and validation through local stability analyses. These analyses were performed using the Unwedge software for the End of Construction load case, and a combined approach of local stability and coupled flow analysis using the Unwedge and Phase software for the operational phase load condition. The results highlighted the necessity of a drainage system consisting of perforated drains in the rock mass, in addition to the standard treatment comprising anchors and shotcrete. This system was crucial for reducing pore pressures acting on potentially unstable wedges around the excavations, particularly in scenarios where one tunnel remained empty while the others were in operation. Currently, all tunnels in the project are in operation and have undergone emptying processes due to operational demands. On none of these occasions were issues observed with the tunnel floor, nor were there any reports of block falls from the walls or crown.

Authors

Institutions

Publication Details

Journal
Revista de Geociências do Nordeste
Published
2025-03-07
DOI
https://doi.org/10.21680/2447-3359.2025v11n1id37824
Citations
1
Primary Topic
Geomechanics and Mining Engineering
Type
article
Field-Weighted Citation Impact
0.86
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Geotechnical treatment analysis for headrace tunnel in gneissic rock mass

Pedro de Carvalho Thá, Vítor Pereira Faro, Alessander Christopher Morales Kormann, Soraia Bastos Katereniuk
1 citations
Revista de Geociências do Nordeste
Geomechanics and Mining Engineering
0.86
article

Geotechnical treatment analysis for headrace tunnel in gneissic rock mass

Pedro de Carvalho Thá, Vítor Pereira Faro, Alessander Christopher Morales Kormann, Soraia Bastos Katereniuk
article en
1 citations

Abstract

This article presents the methodology adopted for the geotechnical design of the support applied to the headrace tunnels of the Laúca Hydropower Plant (AHE Laúca), located in Angola. The plant's headrace system consists of six parallel tunnels, each with an average length of 1900 meters, excavated in a gneissic rock mass. To determine the supports required to maintain excavation stability during the construction phase and the plant's operation, geological and geotechnical tests and investigations were conducted. The results of these investigations supported the studies presented here, providing parameters such as compressive strength and deformability of the rock mass, as well as shear strength of the rock mass discontinuities. The definition of appropriate support to ensure excavation stability was based on the Q-system rock mass classification. After the preliminary design of the support for excavations in competent rock mass, classified as Classes I to III, the proposed support was subjected to verification and validation through local stability analyses. These analyses were performed using the Unwedge software for the End of Construction load case, and a combined approach of local stability and coupled flow analysis using the Unwedge and Phase software for the operational phase load condition. The results highlighted the necessity of a drainage system consisting of perforated drains in the rock mass, in addition to the standard treatment comprising anchors and shotcrete. This system was crucial for reducing pore pressures acting on potentially unstable wedges around the excavations, particularly in scenarios where one tunnel remained empty while the others were in operation. Currently, all tunnels in the project are in operation and have undergone emptying processes due to operational demands. On none of these occasions were issues observed with the tunnel floor, nor were there any reports of block falls from the walls or crown.

Revista de Geociências do NordesteVol. 11(1)
Pontifícia Universidade Católica do Rio de Janeiro (BR), Universidade Federal do Paraná (BR)
Openalex Percentile: Top 33%
Geomechanics and Mining Engineering
0.86
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.