On the Material Properties of a Large PM+HIP Component for Application in Nuclear Power Plants

Elaboration of Nuclear Power Plant (NPP) pipework currently relies on forging/casting and machining processes. However, to maintain performance and competitiveness, Framatome and EDF launched a pre-industrialisation project to demonstrate the ability of HIP and the supply-chain to produce a 8-ton 304L primary elbow in compliance with the nuclear requirements. The final elbow was supplied by Framatome with EDF with Bodycote performing the elbow casing design and the HIP process. The characterisation results confirm its compliance with EDF/Framatome’s requirements, based on current RCC-M code requirements for forged 304L: notably a fine microstructure and strong mechanical properties. They are also homogeneous across the whole elbow. Welding tests show the good weldability of HIP 304L. This large-scale demonstrator shows that the developed HIP process has sufficient maturity for a standardised industrial use in the nuclear industry to provide large homogeneous components with compliant material properties, that can be installed in NPPs.

Authors

Institutions

Publication Details

Journal
Journal of the Japan Society of Powder and Powder Metallurgy
Published
2025-03-14
DOI
https://doi.org/10.2497/jjspm.17c-t4-05
Primary Topic
Welding Techniques and Residual Stresses
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

On the Material Properties of a Large PM+HIP Component for Application in Nuclear Power Plants

Laurent De Baglion, Thibaut De Terris, Yang Shen, Louis Lemarquis et al.
Journal of the Japan Society of Powder and Powder Metallurgy
Welding Techniques and Residual Stresses
article

On the Material Properties of a Large PM+HIP Component for Application in Nuclear Power Plants

Laurent De Baglion, Thibaut De Terris, Yang Shen, Louis Lemarquis, Laella Millot, Mejido Hajjaj, Nawel Boudebza
article en

Abstract

Elaboration of Nuclear Power Plant (NPP) pipework currently relies on forging/casting and machining processes. However, to maintain performance and competitiveness, Framatome and EDF launched a pre-industrialisation project to demonstrate the ability of HIP and the supply-chain to produce a 8-ton 304L primary elbow in compliance with the nuclear requirements. The final elbow was supplied by Framatome with EDF with Bodycote performing the elbow casing design and the HIP process. The characterisation results confirm its compliance with EDF/Framatome’s requirements, based on current RCC-M code requirements for forged 304L: notably a fine microstructure and strong mechanical properties. They are also homogeneous across the whole elbow. Welding tests show the good weldability of HIP 304L. This large-scale demonstrator shows that the developed HIP process has sufficient maturity for a standardised industrial use in the nuclear industry to provide large homogeneous components with compliant material properties, that can be installed in NPPs.

Journal of the Japan Society of Powder and Powder MetallurgyVol. 72(Supplement)
EDF Energy (United Kingdom) (GB), Framatome (Germany) (DE)
Industry, innovation and infrastructure
Openalex Percentile: Top 95%
Welding Techniques and Residual Stresses
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

On the Material Properties of a Large PM+HIP Component for Application in Nuclear Power Plants — Laurent De Baglion, Thibaut De Terris, et al. · Journal of the Japan Society of Powder and Powder Metallurgy (2025) | TGRS Research Map | TGRS