Material characteristics and failure prediction of SA 213 Superheater Boiler tube in power plant with 315 MW capacity

This study was conducted at the Rembang Semarang Unit 2 power plant in Indonesia, with a capacity of 315 MW. The plant has been in operation since 2011, totaling about 13 years or over 100,000 equivalent operating hours (EOH). High-temperature operations can damage tube materials due to temperature, corrosive environment, pressure, and stress. At the end of 2022, a condenser leak at the plant necessitated an assessment of the boiler tube material. This study focuses on evaluating the SA 213 T91 (chromium (Cr) and molybdenum (Mo) alloy steel) superheater tube, a known for its excellent high-temperature mechanical and thermal properties and corrosion resistance. The research aims to assess potential failures in the boiler tube and guide future operational and maintenance plans. The analysis includes destructive testing, SEM, EDX metallography, and creep rupture testing. Results show corrosion and hard scale deposition inside the tube. Its is shown that creep strength decreases significantly at high temperatures, leading to faster material rupture.

Authors

Institutions

Publication Details

Journal
ROTASI
Published
2024-10-16
DOI
https://doi.org/10.14710/rotasi.26.4.1-5
Primary Topic
Aluminum Alloys Composites Properties
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Material characteristics and failure prediction of SA 213 Superheater Boiler tube in power plant with 315 MW capacity

Ariyana Dwiputra Nugraha, Sulardjaka Sulardjaka, Agus Suprihanto, Harianto Harianto
ROTASI
Aluminum Alloys Composites Properties
article

Material characteristics and failure prediction of SA 213 Superheater Boiler tube in power plant with 315 MW capacity

Ariyana Dwiputra Nugraha, Sulardjaka Sulardjaka, Agus Suprihanto, Harianto Harianto
article en

Abstract

This study was conducted at the Rembang Semarang Unit 2 power plant in Indonesia, with a capacity of 315 MW. The plant has been in operation since 2011, totaling about 13 years or over 100,000 equivalent operating hours (EOH). High-temperature operations can damage tube materials due to temperature, corrosive environment, pressure, and stress. At the end of 2022, a condenser leak at the plant necessitated an assessment of the boiler tube material. This study focuses on evaluating the SA 213 T91 (chromium (Cr) and molybdenum (Mo) alloy steel) superheater tube, a known for its excellent high-temperature mechanical and thermal properties and corrosion resistance. The research aims to assess potential failures in the boiler tube and guide future operational and maintenance plans. The analysis includes destructive testing, SEM, EDX metallography, and creep rupture testing. Results show corrosion and hard scale deposition inside the tube. Its is shown that creep strength decreases significantly at high temperatures, leading to faster material rupture.

ROTASIVol. 26(4)
Diponegoro University (ID)
Openalex Percentile: Top 72%
Aluminum Alloys Composites Properties
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Material characteristics and failure prediction of SA 213 Superheater Boiler tube in power plant with 315 MW capacity — Ariyana Dwiputra Nugraha, Sulardjaka Sulardjaka, et al. · ROTASI (2024) | TGRS Research Map | TGRS