Short-term power load forecasting based on DBO-TCN

Abstract Short-term power load forecasting is conducive to the stable operation of the power grid and can rationally allocate resources to reduce the waste of electric energy and promote the realization of the goal of “carbon peak and carbon neutral.” The current power load forecasting models generally have the disadvantages of poor accuracy and long prediction time. In this paper, we propose a dung beetle optimization algorithm combined with a time convolution network (DBO-TCN) model. First, we use DBO to optimize the parameters and then use TCN to predict the results and calculate the evaluation indexes as RMSE (Root Mean Squared Error)=3.7936; MSE(Mean Squared Error)=14.3916; MAE(Mean Absolute Error)=2.7448; MAPE(Mean Absolute Percentage Error)=0.016258; R^2(R-squared)=0.9833. The results are as follows: The model has high accuracy and good stability, which can improve the accuracy of short-term power load forecasting and maintain the stability.

Authors

Institutions

Publication Details

Journal
Journal of Physics Conference Series
Published
2025-03-01
DOI
https://doi.org/10.1088/1742-6596/2975/1/012017
Citations
1
Primary Topic
Energy Load and Power Forecasting
Type
article
Field-Weighted Citation Impact
0.73
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Short-term power load forecasting based on DBO-TCN

Y.Z. Zhang
1 citations
Journal of Physics Conference Series
Energy Load and Power Forecasting
0.73
article

Short-term power load forecasting based on DBO-TCN

Y.Z. Zhang
article en
1 citations

Abstract

Abstract Short-term power load forecasting is conducive to the stable operation of the power grid and can rationally allocate resources to reduce the waste of electric energy and promote the realization of the goal of “carbon peak and carbon neutral.” The current power load forecasting models generally have the disadvantages of poor accuracy and long prediction time. In this paper, we propose a dung beetle optimization algorithm combined with a time convolution network (DBO-TCN) model. First, we use DBO to optimize the parameters and then use TCN to predict the results and calculate the evaluation indexes as RMSE (Root Mean Squared Error)=3.7936; MSE(Mean Squared Error)=14.3916; MAE(Mean Absolute Error)=2.7448; MAPE(Mean Absolute Percentage Error)=0.016258; R^2(R-squared)=0.9833. The results are as follows: The model has high accuracy and good stability, which can improve the accuracy of short-term power load forecasting and maintain the stability.

Journal of Physics Conference SeriesVol. 2975(1)
Liaoning Technical University (CN), Zhoukou Normal University (CN)
Openalex Percentile: Top 31%
Energy Load and Power Forecasting
0.73
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.