A case study on integrating data analysis and process mining in conventional tunnel construction

Conventional tunnel construction often relies on manual methods of construction process analysis, using tools such as paper-based cycle diagrams or spreadsheets, which lack immediate updates and capabilities, limiting performance evaluation, communication, and decision-making. As a result, moving to a fully digital process incorporating business intelligence capabilities can deliver benefits by improving data-driven decision-making, operational efficiency and resource allocation. This paper presents a case study using construction documentation to evaluate the applicability of data and process analytics in conventional tunnelling. We also present a novel approach to visualising and analysing construction sequence deviations. The study demonstrates how data and process analysis can be utilised to evaluate the activity sequences, the duration of single activities, advance rates, and general project performance. By adhering to established industry standards, this research examines the practical implementation of data analysis methods in operational tunnelling environments, contributing to the development of integrated digital workflows. • Statistical methods and process mining enhance resource allocation and activity monitoring in conventional tunnelling. • The proposed prototype helps identify deviations from expected construction sequences and activity durations. • Visualisation of construction data helps identify documentation errors and optimise processes. • A case study demonstrates the benefits of digital documentation and business intelligence in tunnelling.

Authors

Institutions

Publication Details

Journal
Developments in the Built Environment
Published
2025-03-14
DOI
https://doi.org/10.1016/j.dibe.2025.100640
Citations
1
Primary Topic
Business Process Modeling and Analysis
Type
article
Field-Weighted Citation Impact
2.28

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A case study on integrating data analysis and process mining in conventional tunnel construction

Christian Huemer, Marco Huymajer, Oleksandr Melnyk, Alexandra Mazak‐Huemer et al.
1 citations
Developments in the Built Environment
Business Process Modeling and Analysis
2.28
article

A case study on integrating data analysis and process mining in conventional tunnel construction

Christian Huemer, Marco Huymajer, Oleksandr Melnyk, Alexandra Mazak‐Huemer, Lucas Rosenberger
article en
1 citations

Abstract

Conventional tunnel construction often relies on manual methods of construction process analysis, using tools such as paper-based cycle diagrams or spreadsheets, which lack immediate updates and capabilities, limiting performance evaluation, communication, and decision-making. As a result, moving to a fully digital process incorporating business intelligence capabilities can deliver benefits by improving data-driven decision-making, operational efficiency and resource allocation. This paper presents a case study using construction documentation to evaluate the applicability of data and process analytics in conventional tunnelling. We also present a novel approach to visualising and analysing construction sequence deviations. The study demonstrates how data and process analysis can be utilised to evaluate the activity sequences, the duration of single activities, advance rates, and general project performance. By adhering to established industry standards, this research examines the practical implementation of data analysis methods in operational tunnelling environments, contributing to the development of integrated digital workflows. • Statistical methods and process mining enhance resource allocation and activity monitoring in conventional tunnelling. • The proposed prototype helps identify deviations from expected construction sequences and activity durations. • Visualisation of construction data helps identify documentation errors and optimise processes. • A case study demonstrates the benefits of digital documentation and business intelligence in tunnelling.

Developments in the Built EnvironmentVol. 22
Johannes Kepler University of Linz (AT), TU Wien (AT), Montanuniversität Leoben (AT)
Österreichische Forschungsförderungsgesellschaft, Bundesministerium für Bildung, Wissenschaft und Forschung, Technische Universität Wien Bibliothek
Openalex Percentile: Top 14%
Business Process Modeling and Analysis
2.28
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.