Application of Novel Leakage Action Test Equipment for Kaplan Turbine Runner

The leakage action test for Kaplan turbine runners is generally carried out within each maintenance cycle. The test requires the runner chamber to maintain 0.5MPa pressure for 24 hours. During this period, the blades are opened and closed twice or three times per hour to observe the blades’ movement and the leakage of sealing devices. To improve the automation level of testing, this paper designs a novel runner leakage action test equipment. Its working principle, as well as the feasibility of its application in hydro-power plants, are illustrated. Functions, such as automatic oil filling and discharging, one-key start-stop testing, automatic data recording and query, and automatic test report creation, are detailed. The advantages and limitations of the proposed equipment are also discussed, followed by future development direction and improvement suggestions.

Authors

Institutions

Publication Details

Published
2024-12-13
DOI
https://doi.org/10.1109/sgei63936.2024.10914126
Primary Topic
Hydraulic and Pneumatic Systems
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Application of Novel Leakage Action Test Equipment for Kaplan Turbine Runner

Shidong Gao, Jinghui Qiao, Wenbao Jin, Guangzhi Yan et al.
Hydraulic and Pneumatic Systems
article

Application of Novel Leakage Action Test Equipment for Kaplan Turbine Runner

Shidong Gao, Jinghui Qiao, Wenbao Jin, Guangzhi Yan, Honggang Zhang, Chenyang Huang, Xia Deming, Y. P. Pei
article en

Abstract

The leakage action test for Kaplan turbine runners is generally carried out within each maintenance cycle. The test requires the runner chamber to maintain 0.5MPa pressure for 24 hours. During this period, the blades are opened and closed twice or three times per hour to observe the blades’ movement and the leakage of sealing devices. To improve the automation level of testing, this paper designs a novel runner leakage action test equipment. Its working principle, as well as the feasibility of its application in hydro-power plants, are illustrated. Functions, such as automatic oil filling and discharging, one-key start-stop testing, automatic data recording and query, and automatic test report creation, are detailed. The advantages and limitations of the proposed equipment are also discussed, followed by future development direction and improvement suggestions.

State Grid Corporation of China (China) (CN), Tianjin Research Institute of Electric Science (China) (CN)
State Grid Corporation of China
Affordable and clean energy
Openalex Percentile: Top 72%
Hydraulic and Pneumatic Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.