Coal mining activities involve three main activities, namely loading, hauling, and dumping. This research focuses on the technical study of overburden (OB) dumping highdump activities In Pit Dump area with the aim of planning, implementing and evaluating technical, operational, economic, and HSE aspects. This research method includes field observations, stage plan making, and high dumping over water. Actual conditions show a difference in critical dumping height over water with geotechnical recommendations to minimize landslide risk and potential hazards. The study involved the collaboration of Mine Engineer, Geotech Engineer, Safety, and Production, and the use of equipment such as Komatsu HD 785 and Komatsu Dozer D155 & D85. The results showed that these changes could be carried out productively and safely, supporting coal production targets and adding economic value to the government and Mining Business License holders.

Authors

Publication Details

Journal
Manufaktur
Published
2024-12-23
DOI
https://doi.org/10.61132/manufaktur.v2i4.663
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimalisasi Produktivitas dan Keselamatan Kerja Penambangan Menggunakan Metode Highdump Dumping Overburden

Muhammad Osaegi Restu Amrulloh, Endik Riyanto, Ade Putro Setyo Wibowo
Manufaktur
Management and Optimization Techniques
article

Optimalisasi Produktivitas dan Keselamatan Kerja Penambangan Menggunakan Metode Highdump Dumping Overburden

Muhammad Osaegi Restu Amrulloh, Endik Riyanto, Ade Putro Setyo Wibowo
article en

Abstract

Coal mining activities involve three main activities, namely loading, hauling, and dumping. This research focuses on the technical study of overburden (OB) dumping highdump activities In Pit Dump area with the aim of planning, implementing and evaluating technical, operational, economic, and HSE aspects. This research method includes field observations, stage plan making, and high dumping over water. Actual conditions show a difference in critical dumping height over water with geotechnical recommendations to minimize landslide risk and potential hazards. The study involved the collaboration of Mine Engineer, Geotech Engineer, Safety, and Production, and the use of equipment such as Komatsu HD 785 and Komatsu Dozer D155 & D85. The results showed that these changes could be carried out productively and safely, supporting coal production targets and adding economic value to the government and Mining Business License holders.

ManufakturVol. 2(4)
Openalex Percentile: Top 52%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.