Study on the mechanical mechanism and control optimization of station subsurface excavation by pile-beam-arch method

This paper is based on the construction of the underground Pile-Beam-Arch station at Beitaipingzhuang Station of Beijing Metro Line 12. It employs finite element software for three-dimensional numerical modeling, faithfully reproducing the entire station construction process. The results indicate that the excavation of the pilot tunnel and the stage of the secondary lining buckle arch are the main causes of surface deformation. Additionally, the construction of the secondary lining buckle arch is the primary factor inducing deformation in the middle column and side pile. On this basis, the paper investigates the influence of four crucial factors: the stagger distance of the pilot tunnel excavation, the sequence of the secondary lining buckle arch, the excavation sequence of the lower soil, and the excavation depth on the stress and deformation characteristics of the stratum and the station structure. The results suggest that when the distance between adjacent pilot tunnel faces is 1.5 to 3 times the diameter of the pilot tunnel, it has the greatest influence on surface settlement. When the first side is followed by the middle, closely aligning the second lining with the initial support, and simultaneously installing buckle arches on both sides minimizes deformation of the stratum and station structure. During excavation of the lower soil in the station, reducing the single excavation depth and prioritizing excavation on both sides help control deformation of the vertical bearing structure. The optimal construction scheme is derived through multi-criteria optimization and implemented in the field. Field monitoring results are in good agreement with simulation outcomes, offering valuable reference for the construction of stations under similar geological conditions.

Authors

Institutions

Publication Details

Journal
Scientific Reports
Published
2025-03-13
DOI
https://doi.org/10.1038/s41598-025-92929-2
Citations
1
Primary Topic
Geotechnical Engineering and Analysis
Type
article
Field-Weighted Citation Impact
1.30

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Study on the mechanical mechanism and control optimization of station subsurface excavation by pile-beam-arch method

Yusheng Jiang, Renliang Shan, Xiao Tong, Ying Li et al.
1 citations
Scientific Reports
Geotechnical Engineering and Analysis
1.30
article

Study on the mechanical mechanism and control optimization of station subsurface excavation by pile-beam-arch method

Yusheng Jiang, Renliang Shan, Xiao Tong, Ying Li, Nan Liu
article en
1 citations

Abstract

This paper is based on the construction of the underground Pile-Beam-Arch station at Beitaipingzhuang Station of Beijing Metro Line 12. It employs finite element software for three-dimensional numerical modeling, faithfully reproducing the entire station construction process. The results indicate that the excavation of the pilot tunnel and the stage of the secondary lining buckle arch are the main causes of surface deformation. Additionally, the construction of the secondary lining buckle arch is the primary factor inducing deformation in the middle column and side pile. On this basis, the paper investigates the influence of four crucial factors: the stagger distance of the pilot tunnel excavation, the sequence of the secondary lining buckle arch, the excavation sequence of the lower soil, and the excavation depth on the stress and deformation characteristics of the stratum and the station structure. The results suggest that when the distance between adjacent pilot tunnel faces is 1.5 to 3 times the diameter of the pilot tunnel, it has the greatest influence on surface settlement. When the first side is followed by the middle, closely aligning the second lining with the initial support, and simultaneously installing buckle arches on both sides minimizes deformation of the stratum and station structure. During excavation of the lower soil in the station, reducing the single excavation depth and prioritizing excavation on both sides help control deformation of the vertical bearing structure. The optimal construction scheme is derived through multi-criteria optimization and implemented in the field. Field monitoring results are in good agreement with simulation outcomes, offering valuable reference for the construction of stations under similar geological conditions.

Scientific ReportsVol. 15(1)
Hebei University of Engineering (CN), China University of Mining and Technology (CN)
National Natural Science Foundation of China
Openalex Percentile: Top 24%
Geotechnical Engineering and Analysis
1.30
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.