Long-term prediction of tunnel primary lining deformation based on wireless monitoring

Abstract. Due to the harsh construction environment such as blasting excavation and dust, conventional monitoring methods are challenging to be continuously deployed at the primary lining section of the drilling and blasting tunnel, which makes it difficult to capture the large deformation evolution trend and warn the deformation risk. Therefore, this paper takes a biased construction section of Xujiacun tunnel as a site case to implement a wireless sensor network, including gateway and laser distance senor, which is embedded into the primary lining to protect sensors in harsh construction environment for high frequency of primary lining deformation monitoring. Subsequently, a DLinear model is applied, which can be used for the long-term prediction of deformation time-series by splitting deformation sequence into trend sequence and residual sequence. Its prediction performance under different prediction steps is tested, so as to provide accurate and long-term risk early-warning in real-time for construction sites.

Authors

Institutions

Publication Details

Journal
Materials research proceedings
Published
2025-03-13
DOI
https://doi.org/10.21741/9781644903513-5
Primary Topic
Civil and Geotechnical Engineering Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Long-term prediction of tunnel primary lining deformation based on wireless monitoring

Yuxuan Xia
Materials research proceedings
Civil and Geotechnical Engineering Research
article

Long-term prediction of tunnel primary lining deformation based on wireless monitoring

Yuxuan Xia
article en

Abstract

Abstract. Due to the harsh construction environment such as blasting excavation and dust, conventional monitoring methods are challenging to be continuously deployed at the primary lining section of the drilling and blasting tunnel, which makes it difficult to capture the large deformation evolution trend and warn the deformation risk. Therefore, this paper takes a biased construction section of Xujiacun tunnel as a site case to implement a wireless sensor network, including gateway and laser distance senor, which is embedded into the primary lining to protect sensors in harsh construction environment for high frequency of primary lining deformation monitoring. Subsequently, a DLinear model is applied, which can be used for the long-term prediction of deformation time-series by splitting deformation sequence into trend sequence and residual sequence. Its prediction performance under different prediction steps is tested, so as to provide accurate and long-term risk early-warning in real-time for construction sites.

Materials research proceedingsVol. 50
Tongji University (CN)
Openalex Percentile: Top 88%
Civil and Geotechnical Engineering Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Long-term prediction of tunnel primary lining deformation based on wireless monitoring — Yuxuan Xia · Materials research proceedings (2025) | TGRS Research Map | TGRS