Intelligent construction equipment dynamic scheduling technology based on dynamic time regularization algorithm

Due to the specific connection relationship between construction tasks, it is difficult to effectively control the time overhead of construction equipment when executing corresponding tasks. Therefore, an intelligent construction equipment dynamic scheduling technology based on a dynamic time regularization algorithm is proposed. We extract local extreme values of construction task time series, use a dynamic time warping algorithm to fit and analyze the progress of construction tasks, determine the deviation between actual progress and planned progress, establish an intelligent construction equipment dynamic scheduling model, and solve the model based on progress deviation. In the test results, the equipment completed the corresponding construction tasks in less than 70.0 hours, with an overall time consumption of 202.8 hours and a corresponding idle rate of less than 0.1.

Authors

Publication Details

Published
2024-12-13
DOI
https://doi.org/10.1109/icftic64248.2024.10913171
Primary Topic
Engineering Diagnostics and Reliability
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Intelligent construction equipment dynamic scheduling technology based on dynamic time regularization algorithm

S. David Wu
Engineering Diagnostics and Reliability
article

Intelligent construction equipment dynamic scheduling technology based on dynamic time regularization algorithm

S. David Wu
article en

Abstract

Due to the specific connection relationship between construction tasks, it is difficult to effectively control the time overhead of construction equipment when executing corresponding tasks. Therefore, an intelligent construction equipment dynamic scheduling technology based on a dynamic time regularization algorithm is proposed. We extract local extreme values of construction task time series, use a dynamic time warping algorithm to fit and analyze the progress of construction tasks, determine the deviation between actual progress and planned progress, establish an intelligent construction equipment dynamic scheduling model, and solve the model based on progress deviation. In the test results, the equipment completed the corresponding construction tasks in less than 70.0 hours, with an overall time consumption of 202.8 hours and a corresponding idle rate of less than 0.1.

Openalex Percentile: Top 70%
Engineering Diagnostics and Reliability
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.