Analisis Produktivitas Unit Redrying dengan Pendekatan Objective Matrix dan Analytic Hierarchy Process di PT XYZ

The redrying unit is a tobacco drying unit at PT XYZ that functions to enhance aroma, ensure safe storage, and re-dry tobacco with the appropriate moisture level. In recent months, the redrying unit at PT XYZ has experienced a decline. The company management suspects that the decline in productivity is caused by problems with the efficiency of the production process. Therefore, a productivity analysis was conducted to determine the level of tobacco productivity at PT XYZ. In this study, the objective matrix (OMAX) productivity method was used. The weighting of criteria is measured using Analytical Hierarchy Process (AHP). Based on the calculation results, the criteria of electrical energy, machine hours, labor, and raw materials have the highest partial productivity values of 1.22, 3.35, 10.57, and 98, respectively. The highest total productivity was achieved in the March 3 period at 650.7 and the lowest productivity in the November 9 period at 68.6. Improvements are made on all criteria, by applying the objective matrix method, PT XYZ is expected to increase the partial productivity and total productivity of the company in the future.

Authors

Publication Details

Journal
Briliant Jurnal Riset dan Konseptual
Published
2025-02-28
DOI
https://doi.org/10.28926/briliant.v10i1.1894
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisis Produktivitas Unit Redrying dengan Pendekatan Objective Matrix dan Analytic Hierarchy Process di PT XYZ

Rusindiyanto Rusindiyanto, Deni Deni
Briliant Jurnal Riset dan Konseptual
Management and Optimization Techniques
article

Analisis Produktivitas Unit Redrying dengan Pendekatan Objective Matrix dan Analytic Hierarchy Process di PT XYZ

Rusindiyanto Rusindiyanto, Deni Deni
article en

Abstract

The redrying unit is a tobacco drying unit at PT XYZ that functions to enhance aroma, ensure safe storage, and re-dry tobacco with the appropriate moisture level. In recent months, the redrying unit at PT XYZ has experienced a decline. The company management suspects that the decline in productivity is caused by problems with the efficiency of the production process. Therefore, a productivity analysis was conducted to determine the level of tobacco productivity at PT XYZ. In this study, the objective matrix (OMAX) productivity method was used. The weighting of criteria is measured using Analytical Hierarchy Process (AHP). Based on the calculation results, the criteria of electrical energy, machine hours, labor, and raw materials have the highest partial productivity values of 1.22, 3.35, 10.57, and 98, respectively. The highest total productivity was achieved in the March 3 period at 650.7 and the lowest productivity in the November 9 period at 68.6. Improvements are made on all criteria, by applying the objective matrix method, PT XYZ is expected to increase the partial productivity and total productivity of the company in the future.

Briliant Jurnal Riset dan KonseptualVol. 10(1)
Openalex Percentile: Top 94%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.