Research on Optimal Configuration of User Side Photovoltaic Storage Stations Based on Distributed Photovoltaic Field Data Analysis and Prediction

Installed capacity of Yongchuan Longzhao project is 618.27 kW, and component cleaning work was completed on June 12, 2024. The maximum daily power generation before cleaning was 3337.28 kWh on May 13,2024, and the maximum daily power generation after cleaning was 3671.69 kWh on July 2, 2024. The following is comparison of the best historical power generation data curves before and after cleaning. The installed capacity of the Yubei Xingfu project is 199.64 kW. The component cleaning work was completed on May 16, 2024. The maximum daily power generation before cleaning was 830.6 kWh on April 28, 2024, and the maximum daily power generation after cleaning was 1272.6 kWh on July 2, 2024. The three-dimensional volume formed under the three-dimensional surface is the monthly power generation of the photovoltaic power station. Taking the power generation curve of a certain day within 30 days as an example, multiply the power generation at each moment by (5/60) coefficient, and then perform a superposition operation to obtain the daily power generation degree. Based on the power curve data on June 2nd, the daily power generation is calculated to be 308.2 degrees, and the measured value at the metering end is 310 degrees. Using this method, the total power generation for June 30th was calculated to be 37324 kWh, with a measured value of 37454 kWh, resulting in a revenue of 37454 yuan. The Dazu Wanyuhong Photovoltaic Power Station (with capacity of 503.94 kWp) generates 74.3 hours of full capacity electricity in 30 days based on its capacity. Based on smooth load characteristic curve of Meijie Company, it is recommended that the optimal installed capacity of photovoltaic be around 900–1000 KWp, with an internal rate of return of 9.93 % and an investment payback period of 10.02 years.

Authors

Publication Details

Published
2024-10-25
DOI
https://doi.org/10.1109/ccnis64984.2024.00030
Primary Topic
Power Systems and Renewable Energy
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on Optimal Configuration of User Side Photovoltaic Storage Stations Based on Distributed Photovoltaic Field Data Analysis and Prediction

Shiling Zhang, Xiao Qiang, Wu Jungang, Haoyu Wang et al.
Power Systems and Renewable Energy
article

Research on Optimal Configuration of User Side Photovoltaic Storage Stations Based on Distributed Photovoltaic Field Data Analysis and Prediction

Shiling Zhang, Xiao Qiang, Wu Jungang, Haoyu Wang, Qian Zhou
article en

Abstract

Installed capacity of Yongchuan Longzhao project is 618.27 kW, and component cleaning work was completed on June 12, 2024. The maximum daily power generation before cleaning was 3337.28 kWh on May 13,2024, and the maximum daily power generation after cleaning was 3671.69 kWh on July 2, 2024. The following is comparison of the best historical power generation data curves before and after cleaning. The installed capacity of the Yubei Xingfu project is 199.64 kW. The component cleaning work was completed on May 16, 2024. The maximum daily power generation before cleaning was 830.6 kWh on April 28, 2024, and the maximum daily power generation after cleaning was 1272.6 kWh on July 2, 2024. The three-dimensional volume formed under the three-dimensional surface is the monthly power generation of the photovoltaic power station. Taking the power generation curve of a certain day within 30 days as an example, multiply the power generation at each moment by (5/60) coefficient, and then perform a superposition operation to obtain the daily power generation degree. Based on the power curve data on June 2nd, the daily power generation is calculated to be 308.2 degrees, and the measured value at the metering end is 310 degrees. Using this method, the total power generation for June 30th was calculated to be 37324 kWh, with a measured value of 37454 kWh, resulting in a revenue of 37454 yuan. The Dazu Wanyuhong Photovoltaic Power Station (with capacity of 503.94 kWp) generates 74.3 hours of full capacity electricity in 30 days based on its capacity. Based on smooth load characteristic curve of Meijie Company, it is recommended that the optimal installed capacity of photovoltaic be around 900–1000 KWp, with an internal rate of return of 9.93 % and an investment payback period of 10.02 years.

Affordable and clean energy
Openalex Percentile: Top 67%
Power Systems and Renewable Energy
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.