Nurturing nuclear power in India (Featured)
The nuclear industry made a beginning with critical facilities and research reactors, and then moved on to power reactors.Initially, the reactor size was small but was gradually increased to 700-1600 MW range to realise the economy of scale.Lessons learnt from various incidents in nuclear reactors have been incorporated into the designs of operating third-generation reactors.The fourth generation of reactors where the goal includes breeding, utilisation of thorium, achieving high temperature for hydrogen generation and improving cycle efficiency is going through a developmental process that could take a long time to realise.Public perception of nuclear energy has fluctuated over time.The present perception is quite positive because of concerns arising from climate change.At COP-28 in December 2023, 25 nations declared their intent to triple nuclear-installed capacity by mid-century.At COP-29, six more countries joined the group of 25.India plans to triple nuclearinstalled capacity much earlier than mid-century.The Department of Atomic Energy (DAE), Government of India, has projected a target of 100 GW by 2050, which is more than ten times increase compared to the present installed capacity.
Authors
- R.B. Grover (ORCID: https://orcid.org/0000-0003-1353-3079)
Institutions
- Homi Bhabha National Institute (IN)
Publication Details
- Journal
- Current Science
- Published
- 2025-02-10
- DOI
- https://doi.org/10.18520/cs/v128/i3/240-244
- Citations
- 1
- Primary Topic
- Nuclear and radioactivity studies
- Type
- article
- Field-Weighted Citation Impact
- 1.30