Increasing Oil and Gas Well Productivity in Offshore Conditions

In a situation where the demand for oil and gas is increasing day by day, there arereductions in production due to several reasons. As we know, the productivity of the welldepends on several factors. These factors are examined and detailed information is provided inthis article. Among the main issues, processes such as hydraulic fracturing and acid treatmenthave been investigated in order to improve the conductivity of the well bottom zone. In addition,the relationship between reducing the back resistance at the wellhead and choosing the optimalmode for increasing the flow rate of the well was also considered. Attention has been paid to theimportance and possibility of taking preventive measures against the problems identified as aresult of the research conducted in this direction. Among the preventive measures taken againstthe sand problem, which is one of these problems, gravel packing, metal strainer, and chemicalhardening methods were investigated. In addition, attention has been paid to the issue ofincreasing the flow from the formation to the well by removing the fluid collected at the bottomof the well.

Authors

Institutions

Publication Details

Journal
Herald of the Azerbaijan Engineering Academy
Published
2024-12-30
DOI
https://doi.org/10.52171/2076-0515_2024_16_04_40_45
Primary Topic
Reservoir Engineering and Simulation Methods
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Increasing Oil and Gas Well Productivity in Offshore Conditions

S.H. Novruzova, Inglab N. Aliyev
Herald of the Azerbaijan Engineering Academy
Reservoir Engineering and Simulation Methods
article

Increasing Oil and Gas Well Productivity in Offshore Conditions

S.H. Novruzova, Inglab N. Aliyev
article en

Abstract

In a situation where the demand for oil and gas is increasing day by day, there arereductions in production due to several reasons. As we know, the productivity of the welldepends on several factors. These factors are examined and detailed information is provided inthis article. Among the main issues, processes such as hydraulic fracturing and acid treatmenthave been investigated in order to improve the conductivity of the well bottom zone. In addition,the relationship between reducing the back resistance at the wellhead and choosing the optimalmode for increasing the flow rate of the well was also considered. Attention has been paid to theimportance and possibility of taking preventive measures against the problems identified as aresult of the research conducted in this direction. Among the preventive measures taken againstthe sand problem, which is one of these problems, gravel packing, metal strainer, and chemicalhardening methods were investigated. In addition, attention has been paid to the issue ofincreasing the flow from the formation to the well by removing the fluid collected at the bottomof the well.

Herald of the Azerbaijan Engineering AcademyVol. 16(4)
Azerbaijan State Oil and Industry University (AZ)
Openalex Percentile: Top 63%
Reservoir Engineering and Simulation Methods
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Increasing Oil and Gas Well Productivity in Offshore Conditions — S.H. Novruzova, Inglab N. Aliyev · Herald of the Azerbaijan Engineering Academy (2024) | TGRS Research Map | TGRS