Integrating Construction and Operation of Large Interorganizational Projects Based on Resource Orchestration: A Case Study of Shanghai Airports

The separation of construction and operation is a prevalent challenge in large interorganizational projects (LIPs). This study focuses on the integration of construction and operation (ICO) in such projects, aiming to explore how the resource orchestration theory can facilitate the seamless integration of construction and operation. Using Shanghai Airport Group as a case study, this research adopts a longitudinal single-case study approach to analyze 41 years of ICO practices from a full project lifecycle perspective. This study identifies three key phases—synergy, integration, and fusion—and systematically analyzes their respective drivers, actions, and outcomes. Furthermore, grounded in the resource orchestration theory, this study unveils the dynamic evolution mechanism of the ICO in large interorganizational projects. The findings indicate that achieving comprehensive and seamless integration requires project organizers to identify or establish key resources in human capital, technology, and organizational culture. Moreover, through planning alignment and organizational coordination mechanisms, these resources can be effectively connected, transformed, and expanded to facilitate the ICO. By synthesizing practical insights and theoretical deductions, this study provides strategic guidance for enterprises and governments in managing the ICO in large interorganizational projects.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2025-03-11
DOI
https://doi.org/10.3390/buildings15060866
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Integrating Construction and Operation of Large Interorganizational Projects Based on Resource Orchestration: A Case Study of Shanghai Airports

Chao Xiao, Yawei Shao, Xin Chen, Qian Shi et al.
Buildings
Construction Project Management and Performance
article

Integrating Construction and Operation of Large Interorganizational Projects Based on Resource Orchestration: A Case Study of Shanghai Airports

Chao Xiao, Yawei Shao, Xin Chen, Qian Shi, Chenyu Liu
article en

Abstract

The separation of construction and operation is a prevalent challenge in large interorganizational projects (LIPs). This study focuses on the integration of construction and operation (ICO) in such projects, aiming to explore how the resource orchestration theory can facilitate the seamless integration of construction and operation. Using Shanghai Airport Group as a case study, this research adopts a longitudinal single-case study approach to analyze 41 years of ICO practices from a full project lifecycle perspective. This study identifies three key phases—synergy, integration, and fusion—and systematically analyzes their respective drivers, actions, and outcomes. Furthermore, grounded in the resource orchestration theory, this study unveils the dynamic evolution mechanism of the ICO in large interorganizational projects. The findings indicate that achieving comprehensive and seamless integration requires project organizers to identify or establish key resources in human capital, technology, and organizational culture. Moreover, through planning alignment and organizational coordination mechanisms, these resources can be effectively connected, transformed, and expanded to facilitate the ICO. By synthesizing practical insights and theoretical deductions, this study provides strategic guidance for enterprises and governments in managing the ICO in large interorganizational projects.

BuildingsVol. 15(6)
Tongji University (CN)
National Natural Science Foundation of China
Openalex Percentile: Top 95%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Integrating Construction and Operation of Large Interorganizational Projects Based on Resource Orchestration: A Case Study of Shanghai Airports — Chao Xiao, Yawei Shao, et al. · Buildings (2025) | TGRS Research Map | TGRS