Hybrids pre-production results for the CMS Outer Tracker Phase-2 Upgrade
Abstract The CMS Tracker Phase-2 Upgrade requires the production of two co-planar strip sensor (2S) modules, and strip and macro-pixel sensor (PS) modules to cope with the requirements of the HL-LHC. Altogether 47520 hybrid circuits are required to construct 8000 2S and 5880 PS modules. The hybrids pre-production phase is now complete. A pre-series batch enabled the identification of different issues that were resolved with the completion of the pre-production. Various issues and solutions are reported.
Authors
- B. Allongue
- A. Sultan
- P. Szydlik
- D. Andreou (ORCID: https://orcid.org/0000-0001-6288-0558)
- A. Pauls (ORCID: https://orcid.org/0000-0002-8117-5376)
- R. Carnesecchi
- I. Ahmed (ORCID: https://orcid.org/0000-0002-3210-8302)
- A. La Rosa (ORCID: https://orcid.org/0000-0001-6291-2142)
- M. Kovacs (ORCID: https://orcid.org/0009-0001-7317-2976)
- G. Blanchot (ORCID: https://orcid.org/0000-0002-3857-454X)
- K. Klein (ORCID: https://orcid.org/0000-0002-1546-7880)
- M. Lipinski (ORCID: https://orcid.org/0000-0002-6839-0063)
- M. Mohammadi Najafabadi (ORCID: https://orcid.org/0000-0001-6131-5987)
- M. Abbas
- A. Lapornik
Institutions
- University of Southern Denmark (DK)
- European Organization for Nuclear Research (CH)
- RWTH Aachen University (DE)
Publication Details
- Journal
- Journal of Instrumentation
- Published
- 2025-03-01
- DOI
- https://doi.org/10.1088/1748-0221/20/03/c03010
- Citations
- 2
- Primary Topic
- Particle Detector Development and Performance
- Type
- article
- Field-Weighted Citation Impact
- 3.74