Whale Algorithm for Schedule Optimization of Construction Projects Employing Building Information Modeling

ABSTRACT This study introduces a new approach by applying the Whale Optimization Algorithm (WOA) to create construction schedules using geometric data from Building Information Modeling (BIM). The algorithm utilizes 3D model information to establish stability criteria, which are organized in a Directed Design Structure Matrix (DSM). These criteria are integrated into the WOA Fitness function to enhance the constructability of schedules, where each schedule is symbolized as a unique whale. Through iterative WOA computations, the approach consistently achieves maximum constructability scores starting from randomly generated schedules, affirming the efficacy of this method. The results reveal that the proposed algorithm effectively produced fully executable project schedules from diverse inputs. Despite variations in computational times due to different input parameters, the experiments verified the consistent generation of schedules that are 100% executable.

Authors

Institutions

Publication Details

Journal
Engineering Reports
Published
2025-03-01
DOI
https://doi.org/10.1002/eng2.70022
Citations
4
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
4.03
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Whale Algorithm for Schedule Optimization of Construction Projects Employing Building Information Modeling

Javad Vahidi, Morteza Jamshidi, S. M. Golmaei
4 citations
Engineering Reports
BIM and Construction Integration
4.03
article

Whale Algorithm for Schedule Optimization of Construction Projects Employing Building Information Modeling

Javad Vahidi, Morteza Jamshidi, S. M. Golmaei
article en
4 citations

Abstract

ABSTRACT This study introduces a new approach by applying the Whale Optimization Algorithm (WOA) to create construction schedules using geometric data from Building Information Modeling (BIM). The algorithm utilizes 3D model information to establish stability criteria, which are organized in a Directed Design Structure Matrix (DSM). These criteria are integrated into the WOA Fitness function to enhance the constructability of schedules, where each schedule is symbolized as a unique whale. Through iterative WOA computations, the approach consistently achieves maximum constructability scores starting from randomly generated schedules, affirming the efficacy of this method. The results reveal that the proposed algorithm effectively produced fully executable project schedules from diverse inputs. Despite variations in computational times due to different input parameters, the experiments verified the consistent generation of schedules that are 100% executable.

Engineering ReportsVol. 7(3)
Islamic Azad University Sari Branch (IR), Islamic Azad University of Chalous (IR), Iran University of Science and Technology (IR)
Openalex Percentile: Top 8%
BIM and Construction Integration
4.03
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.