Analysis of bonding sheath methods of cables in multi-circuit systems of renewable energy parks

This paper explores induced voltage variations across cable sheaths in multi-circuit systems, specifically focusing on configurations with up to five circuits in a trefoil layout within trenches. We examine how different cable sheath bonding methods affect ampacity calculations for medium voltage cables used in renewable energy parks. Our study reveals that cross-bonding is a effective method for increasing cable ampacity despite requiring additional civil and electromechanical work. In comparison, solid bonding necessitates larger trench dimensions to achieve similar performance, which may lead to higher costs. Further-more, when the cross-bonding method is used, our analysis demonstrates that the highest induced voltage occurs in the outer circuit, particularly with phase C, which is closest to other circuits. These insights are essential for optimizing electrical design in renewable energy parks and addressing the thermal challenges associated with high circuit densities.

Authors

Institutions

Publication Details

Journal
IET conference proceedings.
Published
2025-03-01
DOI
https://doi.org/10.1049/icp.2024.4575
Citations
1
Primary Topic
Renewable energy and sustainable power systems
Type
article
Field-Weighted Citation Impact
0.36
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of bonding sheath methods of cables in multi-circuit systems of renewable energy parks

José Pissolato Filho, Jaimis S. L. Colqui, Jesus E. Guevara Asorza
1 citations
IET conference proceedings.
Renewable energy and sustainable power systems
0.36
article

Analysis of bonding sheath methods of cables in multi-circuit systems of renewable energy parks

José Pissolato Filho, Jaimis S. L. Colqui, Jesus E. Guevara Asorza
article en
1 citations

Abstract

This paper explores induced voltage variations across cable sheaths in multi-circuit systems, specifically focusing on configurations with up to five circuits in a trefoil layout within trenches. We examine how different cable sheath bonding methods affect ampacity calculations for medium voltage cables used in renewable energy parks. Our study reveals that cross-bonding is a effective method for increasing cable ampacity despite requiring additional civil and electromechanical work. In comparison, solid bonding necessitates larger trench dimensions to achieve similar performance, which may lead to higher costs. Further-more, when the cross-bonding method is used, our analysis demonstrates that the highest induced voltage occurs in the outer circuit, particularly with phase C, which is closest to other circuits. These insights are essential for optimizing electrical design in renewable energy parks and addressing the thermal challenges associated with high circuit densities.

IET conference proceedings.Vol. 2024(32)
Universidade Estadual de Campinas (UNICAMP) (BR)
Affordable and clean energy
Openalex Percentile: Top 46%
Renewable energy and sustainable power systems
0.36
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analysis of bonding sheath methods of cables in multi-circuit systems of renewable energy parks — José Pissolato Filho, Jaimis S. L. Colqui, et al. · IET conference proceedings. (2025) | TGRS Research Map | TGRS