Hydraulic machinery and auxiliary system design of Genyem hydropower station in Indonesia

Two sets of vertical-shaft Francis turbine-generator unit of 10MW capacity are installed in Genyem hydropower station in Indonesia with 192.33m rated water head. Adopting the spectrum of turbine series models, turbine with high-efficiency and good cavitation performance is prioritized based on the domestic developed technologies. Then determine the installation elevation of the turbine and the main parameters of the turbine-generator unit and draw the turbine performance curve of the power station. Governor and oil pressure device, turbine inlet valve and auxiliary system equipment of oil system, water system and compressed air system etc. are selected. The selected equipment is safe, reliable and high efficient with stable operation and meet the requirements of the contract, installation, service and maintenance. The power station has been successfully connected to the grid for power generation. The design ideas can be referenced by similar projects.

Authors

Publication Details

Published
2025-03-05
DOI
https://doi.org/10.1117/12.3060115
Primary Topic
Cavitation Phenomena in Pumps
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Hydraulic machinery and auxiliary system design of Genyem hydropower station in Indonesia

Michael Loong Peng Tan, Libao Shi, Jing Yang, Rui Ji
Cavitation Phenomena in Pumps
article

Hydraulic machinery and auxiliary system design of Genyem hydropower station in Indonesia

Michael Loong Peng Tan, Libao Shi, Jing Yang, Rui Ji
article en

Abstract

Two sets of vertical-shaft Francis turbine-generator unit of 10MW capacity are installed in Genyem hydropower station in Indonesia with 192.33m rated water head. Adopting the spectrum of turbine series models, turbine with high-efficiency and good cavitation performance is prioritized based on the domestic developed technologies. Then determine the installation elevation of the turbine and the main parameters of the turbine-generator unit and draw the turbine performance curve of the power station. Governor and oil pressure device, turbine inlet valve and auxiliary system equipment of oil system, water system and compressed air system etc. are selected. The selected equipment is safe, reliable and high efficient with stable operation and meet the requirements of the contract, installation, service and maintenance. The power station has been successfully connected to the grid for power generation. The design ideas can be referenced by similar projects.

Openalex Percentile: Top 96%
Cavitation Phenomena in Pumps
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Hydraulic machinery and auxiliary system design of Genyem hydropower station in Indonesia — Michael Loong Peng Tan, Libao Shi, et al. · (2025) | TGRS Research Map | TGRS