A Tailored Two-Stage Algorithm for Quay Crane and Automated Guided Vehicle Scheduling Problems

The integrated scheduling problem of cranes and automated guided vehicles (AGVs) in automated container terminals is a crucial area of concern for ports. In the terminal with AGV-supports in the yard, AGVs can autonomously place or pick up containers without waiting for yard cranes. Therefore, in such a terminal, meticulous scheduling and coordination between quay cranes (QCs) and AGVs are core for efficient and orderly operations. However, managing the operation of QCs and AGVs is complex as numerous factors affect the operational performance, such as QC interference, vehicle congestion, and limited capacity of handover points. To address the problem, we formulate a mixed-integer linear programming model that explicitly considers the above realistic factors. As the model is computationally inefficient even for small-scale instances, we develop a tailored two-stage algorithm, where the first stage is branch-and-bound for QC operations and the second is column generation for AGV operations. To validate the solution quality, we compare the proposed algorithm with some benchmark methods, and the numerical experiments confirm the effectiveness of the proposed approach.

Authors

Institutions

Publication Details

Journal
IEEE Transactions on Intelligent Transportation Systems
Published
2025-03-05
DOI
https://doi.org/10.1109/tits.2025.3545433
Citations
3
Primary Topic
Advanced Manufacturing and Logistics Optimization
Type
article
Field-Weighted Citation Impact
3.73

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Tailored Two-Stage Algorithm for Quay Crane and Automated Guided Vehicle Scheduling Problems

Zehao Wang, He Wang, Chenrui Qu, Baoli Liu et al.
3 citations
IEEE Transactions on Intelligent Transportation Systems
Advanced Manufacturing and Logistics Optimization
3.73
article

A Tailored Two-Stage Algorithm for Quay Crane and Automated Guided Vehicle Scheduling Problems

Zehao Wang, He Wang, Chenrui Qu, Baoli Liu, Qingcheng Zeng
article en
3 citations

Abstract

The integrated scheduling problem of cranes and automated guided vehicles (AGVs) in automated container terminals is a crucial area of concern for ports. In the terminal with AGV-supports in the yard, AGVs can autonomously place or pick up containers without waiting for yard cranes. Therefore, in such a terminal, meticulous scheduling and coordination between quay cranes (QCs) and AGVs are core for efficient and orderly operations. However, managing the operation of QCs and AGVs is complex as numerous factors affect the operational performance, such as QC interference, vehicle congestion, and limited capacity of handover points. To address the problem, we formulate a mixed-integer linear programming model that explicitly considers the above realistic factors. As the model is computationally inefficient even for small-scale instances, we develop a tailored two-stage algorithm, where the first stage is branch-and-bound for QC operations and the second is column generation for AGV operations. To validate the solution quality, we compare the proposed algorithm with some benchmark methods, and the numerical experiments confirm the effectiveness of the proposed approach.

IEEE Transactions on Intelligent Transportation SystemsVol. 26(4)
Shanxi University (CN), Dalian Maritime University (CN)
National Natural Science Foundation of China, Fundamental Research Funds for the Central Universities
Openalex Percentile: Top 8%
Advanced Manufacturing and Logistics Optimization
3.73
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

A Tailored Two-Stage Algorithm for Quay Crane and Automated Guided Vehicle Scheduling Problems — Zehao Wang, He Wang, et al. · IEEE Transactions on Intelligent Transportation Systems (2025) | TGRS Research Map | TGRS