Prevention of Bedload Transport in a Lateral Water Intake by a Guiding Structure in a Mountain River

A lateral intake withdraws water from the Lech River, a mountain river characterized by high bedload and coarse substrate, to supply a hydropower plant. The water intake features a flushing channel that experiences sedimentation several times a year. Hydraulic sediment removal from the riverbed upstream of the facility and the flushing channel requires a drawdown of the backwater level, resulting in economic losses for operators and reduced green energy production. Therefore, it is essential to prevent sediment aggradation in the flushing channel and the intake of the hydropower plant. Physical model tests with geometric scales of 1:25 and 1:15, respecting Froude similarity, were conducted to explore different sediment guiding structures with objectives to (1) prevent bedload deposition in the flushing channel and bedload transport in the intake of the hydropower plant, (2) enable efficient hydraulic sediment removal from the flushing channel, and (3) provide general insights into the design of guiding structures. The proposed solution combines a deflector, a guiding wall, and a nonerodible area. The deflector serves as a pivotal element in the design proposed in this study. It connects the guiding wall to various bank geometries and protects the flushing channel from sedimentation. This final design optimizes the structure’s size, with variations in the inclination of the guiding wall showing that the best sediment rejection occurs at minimal inclination relative to the main flow direction. Consequently, sediment can be diverted parallel to the wall and discharged downstream via the sluice gates. Additionally, the intake area’s flushing capacity can be maintained by implementing a notch in the guiding wall, which allows for efficient hydraulic sediment removal. Finally, the area between the guiding wall and water intake is protected against erosion to prevent unwanted sediment mobilization.

Authors

Institutions

Publication Details

Journal
Journal of Hydraulic Engineering
Published
2025-03-08
DOI
https://doi.org/10.1061/jhend8.hyeng-14023
Citations
1
Primary Topic
Hydrology and Sediment Transport Processes
Type
article
Field-Weighted Citation Impact
1.72
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Prevention of Bedload Transport in a Lateral Water Intake by a Guiding Structure in a Mountain River

Stefan Achleitner, Jakob Siedersleben, Marco Schuster, Markus Aufleger
1 citations
Journal of Hydraulic Engineering
Hydrology and Sediment Transport Processes
1.72
article

Prevention of Bedload Transport in a Lateral Water Intake by a Guiding Structure in a Mountain River

Stefan Achleitner, Jakob Siedersleben, Marco Schuster, Markus Aufleger
article en
1 citations

Abstract

A lateral intake withdraws water from the Lech River, a mountain river characterized by high bedload and coarse substrate, to supply a hydropower plant. The water intake features a flushing channel that experiences sedimentation several times a year. Hydraulic sediment removal from the riverbed upstream of the facility and the flushing channel requires a drawdown of the backwater level, resulting in economic losses for operators and reduced green energy production. Therefore, it is essential to prevent sediment aggradation in the flushing channel and the intake of the hydropower plant. Physical model tests with geometric scales of 1:25 and 1:15, respecting Froude similarity, were conducted to explore different sediment guiding structures with objectives to (1) prevent bedload deposition in the flushing channel and bedload transport in the intake of the hydropower plant, (2) enable efficient hydraulic sediment removal from the flushing channel, and (3) provide general insights into the design of guiding structures. The proposed solution combines a deflector, a guiding wall, and a nonerodible area. The deflector serves as a pivotal element in the design proposed in this study. It connects the guiding wall to various bank geometries and protects the flushing channel from sedimentation. This final design optimizes the structure’s size, with variations in the inclination of the guiding wall showing that the best sediment rejection occurs at minimal inclination relative to the main flow direction. Consequently, sediment can be diverted parallel to the wall and discharged downstream via the sluice gates. Additionally, the intake area’s flushing capacity can be maintained by implementing a notch in the guiding wall, which allows for efficient hydraulic sediment removal. Finally, the area between the guiding wall and water intake is protected against erosion to prevent unwanted sediment mobilization.

Journal of Hydraulic EngineeringVol. 151(3)
Universität Innsbruck (AT)
Clean water and sanitation
Openalex Percentile: Top 19%
Hydrology and Sediment Transport Processes
1.72
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.