Advancing equipment management for construction: introducing a new model for cost, time and quality optimization

Purpose This paper aims to improve the selection process of heavy machinery in construction projects by developing an advanced optimization technique using the Improved Particle Swarm Optimization algorithm (IPSOM). The main objectives of such a study are to optimize the key parameters of time and cost while ensuring adherence to a predefined quality benchmarks, thereby facilitating more informed and balanced decision-making in construction management. Design/methodology/approach A rigorous methodology was applied to identify the relevant optimization parameters, combining a comprehensive literature review with consultations with industry experts. This approach identified the most influential factors affecting machinery selection, ensuring the model’s applicability and relevance across different project scales and complexities. Unique to this study, the model’s novelty lies in its advanced application of the IPSOM tailored to the construction industry’s specific needs, offering a systematic approach to balancing time, cost and quality considerations. Findings IPSOM was validated through a detailed case study, which provided empirical evidence of the model’s effectiveness in a real-world application. The study introduces a groundbreaking approach to optimizing equipment selection in highway construction, with the dual aims of minimizing costs and project duration while maintaining high-quality standards. The model proposed in the study saved 53% time, reduced costs by 30.8% and increased quality by 26.3%, outperforming traditional equipment selection methods. Originality/value The case study analysis demonstrated the model’s adaptability and potential as a crucial tool for decision-making in construction projects.

Authors

Institutions

Publication Details

Journal
Construction Innovation
Published
2025-03-06
DOI
https://doi.org/10.1108/ci-04-2024-0129
Citations
13
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
13.08
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Advancing equipment management for construction: introducing a new model for cost, time and quality optimization

Odey Alshboul, Ali Shehadeh, Khaled F. Al-Shboul, Omar Tatari
13 citations
Construction Innovation
BIM and Construction Integration
13.08
article

Advancing equipment management for construction: introducing a new model for cost, time and quality optimization

Odey Alshboul, Ali Shehadeh, Khaled F. Al-Shboul, Omar Tatari
article en
13 citations

Abstract

Purpose This paper aims to improve the selection process of heavy machinery in construction projects by developing an advanced optimization technique using the Improved Particle Swarm Optimization algorithm (IPSOM). The main objectives of such a study are to optimize the key parameters of time and cost while ensuring adherence to a predefined quality benchmarks, thereby facilitating more informed and balanced decision-making in construction management. Design/methodology/approach A rigorous methodology was applied to identify the relevant optimization parameters, combining a comprehensive literature review with consultations with industry experts. This approach identified the most influential factors affecting machinery selection, ensuring the model’s applicability and relevance across different project scales and complexities. Unique to this study, the model’s novelty lies in its advanced application of the IPSOM tailored to the construction industry’s specific needs, offering a systematic approach to balancing time, cost and quality considerations. Findings IPSOM was validated through a detailed case study, which provided empirical evidence of the model’s effectiveness in a real-world application. The study introduces a groundbreaking approach to optimizing equipment selection in highway construction, with the dual aims of minimizing costs and project duration while maintaining high-quality standards. The model proposed in the study saved 53% time, reduced costs by 30.8% and increased quality by 26.3%, outperforming traditional equipment selection methods. Originality/value The case study analysis demonstrated the model’s adaptability and potential as a crucial tool for decision-making in construction projects.

Construction InnovationVol. 26(4)
University of Central Florida (US), Jordan University of Science and Technology (JO), Hashemite University (JO), Yarmouk University (JO)
Openalex Percentile: Top 1%
BIM and Construction Integration
13.08
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.