Design of a Parking Building for Manado State Polytechnic Using Efficient and Eco-Friendly Precast Concrete

This study addresses the need for a parking building at Manado State Polytechnic, as the current parking area is insufficient. The research proposes an effective parking solution for motorcycles and cars, utilizing efficient and environmentally friendly precast concrete. It includes the design of the structure, an analysis of its stability, a detailed budget estimate, and an estimation of the construction timeline. The design features columns (350 x 350 x 2500 mm) with main reinforcement of 8D16 and stirrups of D10-200, and beams (250 x 450 x 4650 mm) with main reinforcement of 8D16 and D10-150. The total budget for the precast concrete is IDR 1,411,975,282.06, with an estimated construction period of 90 working days

Authors

Institutions

Publication Details

Journal
International Journal of Integrative Sciences
Published
2025-02-27
DOI
https://doi.org/10.55927/ijis.v4i2.29
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Design of a Parking Building for Manado State Polytechnic Using Efficient and Eco-Friendly Precast Concrete

Rilya Rumbayan, Jeanely Rangkang, Rendi Manitik, Ryan Tandean
International Journal of Integrative Sciences
BIM and Construction Integration
article

Design of a Parking Building for Manado State Polytechnic Using Efficient and Eco-Friendly Precast Concrete

Rilya Rumbayan, Jeanely Rangkang, Rendi Manitik, Ryan Tandean
article en

Abstract

This study addresses the need for a parking building at Manado State Polytechnic, as the current parking area is insufficient. The research proposes an effective parking solution for motorcycles and cars, utilizing efficient and environmentally friendly precast concrete. It includes the design of the structure, an analysis of its stability, a detailed budget estimate, and an estimation of the construction timeline. The design features columns (350 x 350 x 2500 mm) with main reinforcement of 8D16 and stirrups of D10-200, and beams (250 x 450 x 4650 mm) with main reinforcement of 8D16 and D10-150. The total budget for the precast concrete is IDR 1,411,975,282.06, with an estimated construction period of 90 working days

International Journal of Integrative SciencesVol. 4(2)
Manado State University (ID)
Openalex Percentile: Top 96%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.