The Mutriku Breakwater Wave Plant: Improvements and Their Influence on the Levelized Cost of Electricity (LCoE)

The Basque Energy Agency commissioned the Mutriku Wave Power Plant, using an Oscillating Water Column technology in 2011, and although the cumulative total power has been over 3 GW/h until 2023, the initial expectations of efficiency and LCoE have not been accomplished. This paper proposes a series of modifications to the breakwater and chamber geometry of the plant to increase energy production and efficiency. These proposed improvements were tested in experimental campaigns in the modular wave flume in the Energy Engineering Department at the University of the Basque Country, using a mock-up of the original installation. Some results also came from validated numerical simulations, showing that the response amplitude operator and the capture width ratio values were better than those in the original L-shaped power plant. The best configurations appear to be U-shaped and when harbor walls are used. In conclusion, this paper reports the proper configurations and localizations for new wave power plants that could be commercially competitive.

Authors

Publication Details

Journal
Journal of Ocean Engineering and Technology
Published
2025-03-07
DOI
https://doi.org/10.26748/ksoe.2024.099
Citations
5
Primary Topic
Offshore Engineering and Technologies
Type
article
Field-Weighted Citation Impact
5.73
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The Mutriku Breakwater Wave Plant: Improvements and Their Influence on the Levelized Cost of Electricity (LCoE)

Gustavo Adolfo Esteban, J. Blanco, Urko Izquierdo, Alberto Peña et al.
5 citations
Journal of Ocean Engineering and Technology
Offshore Engineering and Technologies
5.73
article

The Mutriku Breakwater Wave Plant: Improvements and Their Influence on the Levelized Cost of Electricity (LCoE)

Gustavo Adolfo Esteban, J. Blanco, Urko Izquierdo, Alberto Peña, Iñigo Bidaguren, Iñigo Albaina
article en
5 citations

Abstract

The Basque Energy Agency commissioned the Mutriku Wave Power Plant, using an Oscillating Water Column technology in 2011, and although the cumulative total power has been over 3 GW/h until 2023, the initial expectations of efficiency and LCoE have not been accomplished. This paper proposes a series of modifications to the breakwater and chamber geometry of the plant to increase energy production and efficiency. These proposed improvements were tested in experimental campaigns in the modular wave flume in the Energy Engineering Department at the University of the Basque Country, using a mock-up of the original installation. Some results also came from validated numerical simulations, showing that the response amplitude operator and the capture width ratio values were better than those in the original L-shaped power plant. The best configurations appear to be U-shaped and when harbor walls are used. In conclusion, this paper reports the proper configurations and localizations for new wave power plants that could be commercially competitive.

Journal of Ocean Engineering and TechnologyVol. 39(2)
Clean water and sanitation
Openalex Percentile: Top 5%
Offshore Engineering and Technologies
5.73
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

The Mutriku Breakwater Wave Plant: Improvements and Their Influence on the Levelized Cost of Electricity (LCoE) — Gustavo Adolfo Esteban, J. Blanco, et al. · Journal of Ocean Engineering and Technology (2025) | TGRS Research Map | TGRS