Flood resource utilization of cascade hydropower stations along the Han River, China, based on a multi-scenario water level drawdown method

Han River, the longest tributary of the Yangtze River, China. In the dual context of global energy shortages and carbon reduction, increasing the share of clean energy in the power supply is imperative. Hydropower, as a crucial component of renewable energy, often sees its significant potential for power generation during flood periods overlooked. This study aims to enhance the joint power generation of cascade hydropower stations under different typical flood scenarios. Firstly, a multi-scenario water level drawdown method is proposed, providing strong technical support for hydropower stations to utilize flood resources and generate more clean power. Then, typical flood scenarios are selected that take into account the relationship between the basin's flood characteristics and the critical flows specified in reservoir flood dispatch regulations. Further, a flood resource utilization scheduling framework is developed to investigate the joint power generation benefit of cascade hydropower stations adopting different credible forecast times under various operational periods. The multi-scenario water level drawdown method can timely lower the reservoir level to the flood control level. Longer credible forecast times don’t always result in better performance, and the appropriate credible forecast time should be selected based on different inflow scenarios to maximize power generation. Through the flood resource utilization scheduling framework, the joint power generation benefit of cascade hydropower stations has increased significantly for 7–1–1 (38.96 *10 4 kW·h), 8–3–1 (145.18 *10 4 kW·h) and 12–1–1 types flood (351.38 *10 4 kW·h). • A flood resource utilization framework of cascade hydropower stations. • The optimal credible forecast time that maximizes the joint power generation. • A new reservoir water level drawdown method suitable for various inflow scenarios. • Typical flood scenarios considering reservoir dispatch regulations are selected.

Authors

Institutions

Publication Details

Journal
Journal of Hydrology Regional Studies
Published
2025-03-07
DOI
https://doi.org/10.1016/j.ejrh.2025.102292
Citations
2
Primary Topic
Water resources management and optimization
Type
article
Field-Weighted Citation Impact
2.29

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Flood resource utilization of cascade hydropower stations along the Han River, China, based on a multi-scenario water level drawdown method

Aijun Guo, Jianxia Chang, Xuebin Wang, Yimin Wang et al.
2 citations
Journal of Hydrology Regional Studies
Water resources management and optimization
2.29
article

Flood resource utilization of cascade hydropower stations along the Han River, China, based on a multi-scenario water level drawdown method

Aijun Guo, Jianxia Chang, Xuebin Wang, Yimin Wang, Zhiqiang Jing
article en
2 citations

Abstract

Han River, the longest tributary of the Yangtze River, China. In the dual context of global energy shortages and carbon reduction, increasing the share of clean energy in the power supply is imperative. Hydropower, as a crucial component of renewable energy, often sees its significant potential for power generation during flood periods overlooked. This study aims to enhance the joint power generation of cascade hydropower stations under different typical flood scenarios. Firstly, a multi-scenario water level drawdown method is proposed, providing strong technical support for hydropower stations to utilize flood resources and generate more clean power. Then, typical flood scenarios are selected that take into account the relationship between the basin's flood characteristics and the critical flows specified in reservoir flood dispatch regulations. Further, a flood resource utilization scheduling framework is developed to investigate the joint power generation benefit of cascade hydropower stations adopting different credible forecast times under various operational periods. The multi-scenario water level drawdown method can timely lower the reservoir level to the flood control level. Longer credible forecast times don’t always result in better performance, and the appropriate credible forecast time should be selected based on different inflow scenarios to maximize power generation. Through the flood resource utilization scheduling framework, the joint power generation benefit of cascade hydropower stations has increased significantly for 7–1–1 (38.96 *10 4 kW·h), 8–3–1 (145.18 *10 4 kW·h) and 12–1–1 types flood (351.38 *10 4 kW·h). • A flood resource utilization framework of cascade hydropower stations. • The optimal credible forecast time that maximizes the joint power generation. • A new reservoir water level drawdown method suitable for various inflow scenarios. • Typical flood scenarios considering reservoir dispatch regulations are selected.

Journal of Hydrology Regional StudiesVol. 58
Xi'an University of Technology (CN)
National Natural Science Foundation of China
Clean water and sanitation
Openalex Percentile: Top 14%
Water resources management and optimization
2.29
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.