An Iterative Greedy Algorithm for Solving a Multiobjective Distributed Assembly Flexible Job Shop Scheduling Problem With Fuzzy Processing Time

Deterministic processing time are no longer applicable under realistic circumstances because of the uncertainties involved in manufacturing and production processes. The present study aims to address a multiobjective distributed assembly flexible job shop scheduling problem with type-2 fuzzy time (DAT2FFJSP), focusing on the optimization objectives of minimizing the makespan and total energy consumption. To address this problem, a mixed-integer linear programming model is presented. Then, a population-based iterative greedy algorithm (PBIGA) with a Q-learning mechanism is proposed, which possesses the following characteristics: 1) a hybrid initialization method is used to generate the population; 2) six local search operators, crossover operators, and mutation operators are applied to explore and exploit the solution space; and 3) the Q-learning mechanism intelligently utilizes historical information on the success of local search operator updates to determine the most suitable perturbation operator; and 4) an energy-saving strategy is applied to improve the candidate solutions. Finally, the effectiveness of the proposed components is validated through extensive experiments that are conducted on 30 instances. The PBIGA outperforms the state-of-the-art algorithms on the DAT2FFJSP.

Authors

Institutions

Publication Details

Journal
IEEE Transactions on Cybernetics
Published
2025-03-07
DOI
https://doi.org/10.1109/tcyb.2025.3538007
Citations
17
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
21.12

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

An Iterative Greedy Algorithm for Solving a Multiobjective Distributed Assembly Flexible Job Shop Scheduling Problem With Fuzzy Processing Time

Fuqing Zhao, Yuqing Du, Ling Wang, Yang Yu et al.
17 citations
IEEE Transactions on Cybernetics
Scheduling and Optimization Algorithms
21.12
article

An Iterative Greedy Algorithm for Solving a Multiobjective Distributed Assembly Flexible Job Shop Scheduling Problem With Fuzzy Processing Time

Fuqing Zhao, Yuqing Du, Ling Wang, Yang Yu, Changxue Zhuang
article en
17 citations

Abstract

Deterministic processing time are no longer applicable under realistic circumstances because of the uncertainties involved in manufacturing and production processes. The present study aims to address a multiobjective distributed assembly flexible job shop scheduling problem with type-2 fuzzy time (DAT2FFJSP), focusing on the optimization objectives of minimizing the makespan and total energy consumption. To address this problem, a mixed-integer linear programming model is presented. Then, a population-based iterative greedy algorithm (PBIGA) with a Q-learning mechanism is proposed, which possesses the following characteristics: 1) a hybrid initialization method is used to generate the population; 2) six local search operators, crossover operators, and mutation operators are applied to explore and exploit the solution space; and 3) the Q-learning mechanism intelligently utilizes historical information on the success of local search operator updates to determine the most suitable perturbation operator; and 4) an energy-saving strategy is applied to improve the candidate solutions. Finally, the effectiveness of the proposed components is validated through extensive experiments that are conducted on 30 instances. The PBIGA outperforms the state-of-the-art algorithms on the DAT2FFJSP.

IEEE Transactions on CyberneticsVol. 55(5)
Lanzhou University of Technology (CN), Jiangsu University of Technology (CN), Tsinghua University (CN)
National Natural Science Foundation of China
Decent work and economic growth
Openalex Percentile: Top 1%
Scheduling and Optimization Algorithms
21.12
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

An Iterative Greedy Algorithm for Solving a Multiobjective Distributed Assembly Flexible Job Shop Scheduling Problem With Fuzzy Processing Time — Fuqing Zhao, Yuqing Du, et al. · IEEE Transactions on Cybernetics (2025) | TGRS Research Map | TGRS