Optimizing Rebar Process and Supply Chain Management for Minimized Cutting Waste: A Building Information Modeling-Based Data-Driven Approach

Rebar procurement inefficiencies, such as inaccurate quantity estimation and misaligned delivery schedules, often lead to excessive waste, supply shortages, and project delays. While existing optimization methods reduce cutting waste, their effectiveness diminishes without integration into supply chain management (SCM). This study presents an integrated framework to optimize rebar processing and supply chain management (SCM) by leveraging Building Information Modeling (BIM) and data-driven optimization strategies. A 24-floor case study validated the approach, optimizing continuous main rebars into special lengths and combining discontinuous lengths into cutting patterns based on special lengths. Rebar orders were organized into 12 batches, each meeting a 15-ton minimum and requiring order placement at least two months in advance. An activity database integrated rebar optimization with the construction schedule, facilitating SCM analysis. BIM automation streamlined procurement by generating Bar Bending Schedules (BBSs) and synchronizing rebar tracking with real-time updates, improving coordination, efficiency, and project outcomes, particularly in high-rise building projects.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2025-03-07
DOI
https://doi.org/10.3390/buildings15060844
Citations
1
Primary Topic
Optimization and Packing Problems
Type
article
Field-Weighted Citation Impact
1.24
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimizing Rebar Process and Supply Chain Management for Minimized Cutting Waste: A Building Information Modeling-Based Data-Driven Approach

Daniel Darma Widjaja, Titi Sari Nurul Rachmawati, Sunkuk Kim, Lwun Poe Khant et al.
1 citations
Buildings
Optimization and Packing Problems
1.24
article

Optimizing Rebar Process and Supply Chain Management for Minimized Cutting Waste: A Building Information Modeling-Based Data-Driven Approach

Daniel Darma Widjaja, Titi Sari Nurul Rachmawati, Sunkuk Kim, Lwun Poe Khant, Dong-Jin Kim
article en
1 citations

Abstract

Rebar procurement inefficiencies, such as inaccurate quantity estimation and misaligned delivery schedules, often lead to excessive waste, supply shortages, and project delays. While existing optimization methods reduce cutting waste, their effectiveness diminishes without integration into supply chain management (SCM). This study presents an integrated framework to optimize rebar processing and supply chain management (SCM) by leveraging Building Information Modeling (BIM) and data-driven optimization strategies. A 24-floor case study validated the approach, optimizing continuous main rebars into special lengths and combining discontinuous lengths into cutting patterns based on special lengths. Rebar orders were organized into 12 batches, each meeting a 15-ton minimum and requiring order placement at least two months in advance. An activity database integrated rebar optimization with the construction schedule, facilitating SCM analysis. BIM automation streamlined procurement by generating Bar Bending Schedules (BBSs) and synchronizing rebar tracking with real-time updates, improving coordination, efficiency, and project outcomes, particularly in high-rise building projects.

BuildingsVol. 15(6)
University of Indonesia (ID), Kyung Hee University (KR)
Openalex Percentile: Top 22%
Optimization and Packing Problems
1.24
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.