Analysis of Subcontractor Selection Criteria by the Main Contractor in the Implementation of Building Construction in Aceh
The implementation of construction is greatly influenced by the role of the subcontractor chosen appropriately. The selection of inappropriate subcontractors can hinder the smooth running of the project. This process is controlled by many criteria. A total of 5 criteria that affect the selection of subcontractors by the main contractor based on previous research. Data collection by questionnaire survey of 74 building classification contractor companies with non-small qualifications. The results of this study show that the most influential criterion in the selection of subcontractors by the main contractor in the implementation of building construction in Aceh is the quality of performance with a percentage of 21.98%, followed by business and labor health 21.79%, then the previous performance of 21.61%, after that planning and control of 20.87%, and the lowest percentage is on safety performance13.75 %.
Authors
- Cut Zukhrina Oktaviani
- Alfa Taras Bulba
- Mubarak Mubarak (ORCID: https://orcid.org/0000-0002-3292-1758)
- Naufal Rizkyyanda
Institutions
- Universitas Syiah Kuala (ID)
Publication Details
- Journal
- Formosa Journal of Science and Technology
- Published
- 2025-02-27
- DOI
- https://doi.org/10.55927/fjst.v4i2.13
- Primary Topic
- BIM and Construction Integration
- Type
- article
- Field-Weighted Citation Impact
- 0.00