Light Steel Company is an industry engaged in manufacturing, has adopted technology and has a data center. The purpose of this study is to provide a guide and strategy for preventing risks and actions to minimize and overcome risks that can be used and implemented, so that the company's business processes can continue to run sustainably. This study uses Business Continuity Plan (BCP) using ISO 31000. Data collection is used by an interviewing employee who works at this organization. The analysis shows there are 15 possible risks that will hinder the operation of Light Steel companies based on the risk level high, medium, and low categories. High risk level is 26.7%, there are 4 possible risks, namely R05 (Loss of spare parts), R06 (Unscheduled maintenance and care for trucks and equipment spare parts), R10 (Server down) and R012 (Network connection problems). Medium risk level is 26.7%, there are 4 possible risks, namely R02 (flood), R07 (Cybercrime), R08 (Hacking), and R011 (Sudden power outage). Finally for low risk level is 46.6%, there are 7 possible risks, namely R01 (Earthquake), R03 (Dust), R04 (Fire), R09 (Abuse of access rights), R13 (Overheat), R14 (Data Corrupt), and R15 (Virus Attack, Malware).

Authors

Institutions

Publication Details

Journal
Journal of Information Systems and Informatics
Published
2024-12-31
DOI
https://doi.org/10.51519/journalisi.v6i4.955
Primary Topic
Supply Chain Resilience and Risk Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Risk Analysis of Business Continuity Plan in Light Steel Company Using ISO 31000 Framework

Kevin Christianto, Johanes Fernandes Andry, Francka Sakti Lee, Yunianto Purnomo
Journal of Information Systems and Informatics
Supply Chain Resilience and Risk Management
article

Risk Analysis of Business Continuity Plan in Light Steel Company Using ISO 31000 Framework

Kevin Christianto, Johanes Fernandes Andry, Francka Sakti Lee, Yunianto Purnomo
article en

Abstract

Light Steel Company is an industry engaged in manufacturing, has adopted technology and has a data center. The purpose of this study is to provide a guide and strategy for preventing risks and actions to minimize and overcome risks that can be used and implemented, so that the company's business processes can continue to run sustainably. This study uses Business Continuity Plan (BCP) using ISO 31000. Data collection is used by an interviewing employee who works at this organization. The analysis shows there are 15 possible risks that will hinder the operation of Light Steel companies based on the risk level high, medium, and low categories. High risk level is 26.7%, there are 4 possible risks, namely R05 (Loss of spare parts), R06 (Unscheduled maintenance and care for trucks and equipment spare parts), R10 (Server down) and R012 (Network connection problems). Medium risk level is 26.7%, there are 4 possible risks, namely R02 (flood), R07 (Cybercrime), R08 (Hacking), and R011 (Sudden power outage). Finally for low risk level is 46.6%, there are 7 possible risks, namely R01 (Earthquake), R03 (Dust), R04 (Fire), R09 (Abuse of access rights), R13 (Overheat), R14 (Data Corrupt), and R15 (Virus Attack, Malware).

Journal of Information Systems and InformaticsVol. 6(4)
University of Bunda Mulia (ID), Universitas Mulia (ID)
Openalex Percentile: Top 52%
Supply Chain Resilience and Risk Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Risk Analysis of Business Continuity Plan in Light Steel Company Using ISO 31000 Framework — Kevin Christianto, Johanes Fernandes Andry, et al. · Journal of Information Systems and Informatics (2024) | TGRS Research Map | TGRS